Mohawk Joins Climate Pledge

Commercial flooring manufacturer Mohawk Group has joined the Climate Pledge, an effort launched by Amazon and Global Optimism with the aim of accelerating climate action above and beyond the goals set out in the Paris Agreement.

The Climate Pledge, launched in 2019, aims for carbon neutrality by 2040, 10 years ahead of the Paris Agreement. It includes three commitments: regular reporting, carbon elimination and meaningful, credible carbon offsets. Signatories to the pledge as of this writing number more than 200 and represent more than $1.8 trillion in annual revenues — a little more than 2.1% of the gross world product (as of 2020) and are "expected to collectively mitigate 1.98 billion metric tons (BMT) of carbon emissions from a 2020 baseline. This is equivalent to 5.4% of current global annual emissions." In September alone, 83 companies joined the pledge, including Procter & Gamble, HP and Salesforce.

According to Mohawk: "Mohawk Group has already begun implementing major manufacturing changes to eliminate its carbon footprint, striving toward a holistic improvement of its flooring's lifecycle to reduce the amounts of water, energy, carbon and waste involved in the process. As of 2022, all Mohawk Group flooring products will be carbon neutral plus an additional 5% carbon offset; the group’s carpet tile already meets this goal. With this new initiative, all Mohawk Group hard surface and soft surface floors will have a net positive impact on climate."

Further details about the Climate Pledge can be found at theclimatepledge.com.

About the Author

David Nagel is the former editorial director of 1105 Media's Education Group and editor-in-chief of THE Journal, STEAM Universe, and Spaces4Learning. A 30-year publishing veteran, Nagel has led or contributed to dozens of technology, art, marketing, media, and business publications.

He can be reached at [email protected]. You can also connect with him on LinkedIn at https://www.linkedin.com/in/davidrnagel/ .


Featured

  • Montclair State University Debuts New VR Facility

    Montclair State University in Montclair, N.J., recently announced the completion of a new virtual reality learning facility developed in partnership with Dreamscape Learn, according to a news release. The 2,450-square-foot lab space is inside the College of Communication and Media building and will serve students pursuing careers in digital media, virtual reality, and content creation.

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.