Mohawk Joins Climate Pledge

Commercial flooring manufacturer Mohawk Group has joined the Climate Pledge, an effort launched by Amazon and Global Optimism with the aim of accelerating climate action above and beyond the goals set out in the Paris Agreement.

The Climate Pledge, launched in 2019, aims for carbon neutrality by 2040, 10 years ahead of the Paris Agreement. It includes three commitments: regular reporting, carbon elimination and meaningful, credible carbon offsets. Signatories to the pledge as of this writing number more than 200 and represent more than $1.8 trillion in annual revenues — a little more than 2.1% of the gross world product (as of 2020) and are "expected to collectively mitigate 1.98 billion metric tons (BMT) of carbon emissions from a 2020 baseline. This is equivalent to 5.4% of current global annual emissions." In September alone, 83 companies joined the pledge, including Procter & Gamble, HP and Salesforce.

According to Mohawk: "Mohawk Group has already begun implementing major manufacturing changes to eliminate its carbon footprint, striving toward a holistic improvement of its flooring's lifecycle to reduce the amounts of water, energy, carbon and waste involved in the process. As of 2022, all Mohawk Group flooring products will be carbon neutral plus an additional 5% carbon offset; the group’s carpet tile already meets this goal. With this new initiative, all Mohawk Group hard surface and soft surface floors will have a net positive impact on climate."

Further details about the Climate Pledge can be found at theclimatepledge.com.

About the Author

David Nagel is the former editorial director of 1105 Media's Education Group and editor-in-chief of THE Journal, STEAM Universe, and Spaces4Learning. A 30-year publishing veteran, Nagel has led or contributed to dozens of technology, art, marketing, media, and business publications.

He can be reached at [email protected]. You can also connect with him on LinkedIn at https://www.linkedin.com/in/davidrnagel/ .


Featured

  • Benson Polytechnic High School in Portland, OR

    Preserving Legacy, Designing for the Future

    As historic academic buildings age, institutions face a difficult decision: preserve and adapt or demolish and rebuild. How do we honor the legacy of these spaces while adapting them to meet the needs of modern learners?

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • University of Arizona Approves New Residence Hall

    The Arizona Board of Regents recently approved plans for a new residence hall at the University of Arizona in Tucson, Ariz., according to a news release. The new facility is scheduled to open in fall 2028 and have the capacity for more than 1,200 students, enforcing a new university expectation that all first-year students live on campus.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.