Mohawk Joins Climate Pledge

Commercial flooring manufacturer Mohawk Group has joined the Climate Pledge, an effort launched by Amazon and Global Optimism with the aim of accelerating climate action above and beyond the goals set out in the Paris Agreement.

The Climate Pledge, launched in 2019, aims for carbon neutrality by 2040, 10 years ahead of the Paris Agreement. It includes three commitments: regular reporting, carbon elimination and meaningful, credible carbon offsets. Signatories to the pledge as of this writing number more than 200 and represent more than $1.8 trillion in annual revenues — a little more than 2.1% of the gross world product (as of 2020) and are "expected to collectively mitigate 1.98 billion metric tons (BMT) of carbon emissions from a 2020 baseline. This is equivalent to 5.4% of current global annual emissions." In September alone, 83 companies joined the pledge, including Procter & Gamble, HP and Salesforce.

According to Mohawk: "Mohawk Group has already begun implementing major manufacturing changes to eliminate its carbon footprint, striving toward a holistic improvement of its flooring's lifecycle to reduce the amounts of water, energy, carbon and waste involved in the process. As of 2022, all Mohawk Group flooring products will be carbon neutral plus an additional 5% carbon offset; the group’s carpet tile already meets this goal. With this new initiative, all Mohawk Group hard surface and soft surface floors will have a net positive impact on climate."

Further details about the Climate Pledge can be found at theclimatepledge.com.

About the Author

David Nagel is the former editorial director of 1105 Media's Education Group and editor-in-chief of THE Journal, STEAM Universe, and Spaces4Learning. A 30-year publishing veteran, Nagel has led or contributed to dozens of technology, art, marketing, media, and business publications.

He can be reached at [email protected]. You can also connect with him on LinkedIn at https://www.linkedin.com/in/davidrnagel/ .


Featured

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • Wisconsin District Breaks Ground on New Elementary School

    The School District of La Crosse in La Crosse, Wis., recently broke ground on a new elementary school that will consolidate the students and staff of two existing schools, according to local news. Funding for the school comes from a $53-million referendum approved in 2024.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.