Harvard Divinity School Completes Renovation of Swartz Hall

Harvard Divinity School in Cambridge, Mass., recently announced that the renovation and expansion project for Swartz Hall has been completed. According to a news release, the 60,000-square-foot renovation and 13,000-square-foot expansion began in May 2019 and was finished in August 2021. Swartz Hall was originally built in 1911 and serves as the hub of academic, administrative and student life for the program.

Harvard University partnered with construction management firm Shawmut Design and Construction and architecture firm Ann Beha Architects in tacking the building’s first major renovation since its original completion.

“The completion of this historic renovation of Swartz Hall marks a significant milestone in the celebrated legacy of Harvard Divinity School,” said Kevin Sullivan, executive vice president of Shawmut Design and Construction’s New England region. “Our team expertly navigated the preservation of the building’s historical significance and character-defining details while increasing energy efficiency and creating a welcoming, accessible, and modern environment that embodies the school’s vision for an inclusive campus.”

Harvard Divinity School Swartz Hall

The two-story addition features a glass façade to allow for maximum daylighting and scenic views of the campus. The ground level features a dining commons area, a fireplace lounge made of repurposed granite from the original structure, an outdoor terrace and a granite front porch. The new addition’s second floor contains a 200-seat multipurpose area and classrooms integrated with projectors, monitors, cameras, microphones and touch-panel control systems.

Shawmut also balanced preserving the historic campus building with modernizing it and making it more energy efficient. Renovations to the mechanical system and building envelope, including replacing the roof, are meant to reduce energy consumption. The building’s former stack wing, which contained five levels of book shelving, has been replaced with three levels of classrooms and workspaces and a new multi-faith space. According to a news release, one of the primary goals of the project was to create a space in which all members of the HDS community felt welcome, no matter their faith.

The project was completed with certain sustainability goals in mind: The renovations targeted LEED Gold or higher, and also a Living Building Challenge Materials Petal. Another sustainability goal was to divert a minimum of 75% of construction and demolition waste away from landfills, including repurposing granite and wood from the original structure throughout the building.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Florida District Selects Designer for K–8 Prototype Campus

    St. Lucie Public Schools in St. Lucie, Fla., recently announced that it has selected Spiezle Architectural Group, Inc., to design its new Western Grove K–8 prototype campus, according to a news release. Construction on the 217,500-square-foot facility will begin in February 2025 and is scheduled for completion in August 2026.

  • Minnesota High School Completes $226M Addition, Renovation Project

    White Bear Lake Area High School – North Campus in White Bear Lake, Minn., recently announced the completion of a $226-million renovation and addition project, according to a news release. The district partnered with Kraus-Anderson for the project’s construction, which involved creating a single high-school site for the White Bear Lake Area School District.

  • Case Systems makerspace

    Case Systems Launches Line of K–12 Learning Spaces Installations

    Case Systems recently announced the launch of SALTO, a line of classroom fixtures and installations for K–12 learning spaces like STEM labs, art rooms, and makerspaces, according to a news release. The product line is designed to provide teachers with flexibility and adaptability, enabling them to shift between collaborative and individual learning environments.

  • All Surfaces Announces New Director of Commercial Business Development

    Surface solutions provider All Surfaces recently announced that it has hired a new Director of Commercial Business Development in Torie Bonafede. Bonafede will work to build the company’s market presence in various categories and drive strategic initiatives to expand its commercial sales portfolio.

Digital Edition