Allan Hancock College Debuts Completed Fine Arts Complex

Allan Hancock College in Santa Maria, Calif., recently opened its new Fine Arts Complex to the campus community, according to a news release. The new facility brings together all of the college’s fine arts disciplines—including art, graphics, animation, photography, music, film, dance, and more—underneath a single roof for the first time. The college partnered with architecture firm DLR Group for the project’s design.

The facility measures in at 88,000 square feet and features amenities like a performance space with a capacity of 400; rehearsal space for dance, band, and choruses; ceramics studios, recording studios, painting studios, and graphic design studios; a film classroom and screening room; and labs for photography and digital media. The building also features a two-story central gathering space and an outdoor courtyard for interdisciplinary collaboration.

“The grand opening celebration for the new Fine Arts Building is also a celebration of new opportunities for the arts moving into a single location on campus,” said DLR Group Principal Dennis Bree, AIA, LEED. “Students from all arts disciplines will gather to inspire each other and celebrate creativity with a facility that connects them to daylight, landscape, and modern technology. Our design team is thrilled to open new areas for social gathering, critical discussion, and display that showcase the incredible talent of our students at Allan Hancock College.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Purdue Fort Wayne Opens New Student Housing Complex

    Purdue University Fort Wayne (PFW) in Fort Wayne, Ind., recently held a ribbon-cutting ceremony for a new, 600-bed student housing complex on campus, according to a news release.

  • R.I. District Holds Ribbon-Cutting Ceremony for New Elementary School

    Cranston Public Schools in Cranston, R.I., recently announced the completion of Gladstone Elementary School, according to a news release. The 100,000-square-foot facility serves as a replacement for the 1950s-era former building, and it consolidates the student, faculty, and staff populations of Gladstone and Arlington Elementary Schools.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.