New Jersey K–12 District, PureTek Partner to Create Three New Education Spaces

Audiovisual solutions company PureTek Group recently partnered with Plainfield Public Schools in Plainfield, N.J., to create three new educational spaces for the district, according to a news release. The project involves upgrading the existing Plainfield High School auditorium into a performing arts center, a mini-theater into a blackbox theater, and two adjacent unused classrooms into an Esports Arena. The renovations will create new STEAM and CTE learning opportunities across the district.

The Esports Arena contains 20 gaming stations for players, as well as additional stations for broadcast operators, shoutcasters, and a replay operator. Spectators can watch from the school’s auditorium, and the blackbox theater also serves as a greenroom for teams not currently playing. Technology highlights include immersive lighting via criss-crossing, ceiling-mounted strips; integration with the performing arts center and blackbox theater; and broadcasting capabilities.

The Performing Arts Center (PAC) has a capacity for 1,600 and will play home to student performances. In addition to Esports Tournaments, it will also be used for rentals and community support programs. Technology highlights include the unRAVL Controls, which offer streamlined and intuitive control for rigging, AV, and lighting systems from a single touch panel. The PAC also has a large projection screen with a 30,000-lumen 4K laser projector, according to a project fact sheet.

The Blackbox Theater has a 120-seat capacity and will be used for arts education and performance spaces. It can also serve as the esports green room, as a professional education space, and a college-style lecture hall to prepare older students for university settings. The Blackbox Theater also uses the unRAVL System for rigging, audio, visual, and lighting solutions, the fact sheet reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

  • Surging Demand for Student Housing Fuels Major Campus Investment Opportunities

    University leaders throughout the U.S. are accelerating plans to modernize and expand student housing as enrollment stabilizes and demand for on-campus living rebounds. Recent data from the National Center for Education Statistics indicates that total postsecondary enrollment is projected to grow through the end of the decade, with undergraduate enrollment alone expected to increase by more than 8 percent by 2030.

  • 144-Year-Old High-School Campus Debuts New Academic Facility

    San Diego High School (SDHS) in San Diego, Calif., recently held a ribbon-cutting ceremony for a new student services and classroom building; the project is part of a larger SDHS Whole Site Modernization project that began in 2022.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.