Minnesota District Completes Major Renovations, Expansions to High School

White Bear Lake Area Schools in White Bear Lake, Minn., recently announced that it has completed the renovation and expansion of White Bear Lake Area High School, according to a news release. The school’s final addition, a new 845-seat Performing Arts Center, was finished in November. The district partnered with Wold Architects and Engineers for the project, which involved 285,000 square feet of renovation and 375,000 square feet of additions.

Funding for the project came from a $326-million bond request that local voters approved in November 2019. Previously, the high school’s students were split between the North Campus (for freshmen and sophomores) and the South Campus (for juniors and seniors). The primary goal was to unite the whole student body beneath one roof, which involved significant improvements to the North Campus facility.

“This project is about more than just a building—it’s about creating a future for our students that reflects the values and voices of our community,” said White Bear Lake Area Schools Superintendent Wayne Kazmierczak. “By uniting all of our high school students and staff under one campus, we’ve created an environment where collaboration, growth and opportunity thrive. This school ensures that our students are not only prepared for today but are ready to meet the challenges of tomorrow, and we’re proud to be in a space that honors our past while embracing the potential of our future.”

The school is designed around career pathways programming and features a series of interconnected flexible learning spaces called Learning Studios. Beyond the three-story classroom and specialty lab space addition—and the Performing Arts Center—other amenities include a five-station athletics field house, a 200m track, and a student union with dining options and event space.

“Our design approach for White Bear Lake Area High School was focused on breaking down traditional barriers to learning by creating open, flexible spaces that empower students to take control of their educational experience,” said Wold Architects and Engineers Partner Paul Aplikowski. “The new Learning Studios, collaborative areas and dynamic seating options reflect a forward-thinking vision for how education can adapt to meet the needs of every student. This school stands as a testament to the community’s commitment to fostering innovation, engagement and lifelong learning, and we are honored to have played a role in bringing that vision to life.”

The district also partnered with Kraus-Anderson as construction manager, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at mjones@1105media.com.

Featured

  • zSpace Imagine Learning Solution

    zSpace Introduces Headset-Free AR/VR System

    Immersive learning company zSpace has debuted the zSpace Imagine Learning Solution, a headset-free AR/VR laptop system designed for elementary education. The all-in-one platform integrates hardware, software, and hands-on lessons to create dynamic learning experiences for young students.

  • Understanding the Training of School Resource Officers

    SROs are now integral components of nearly every educational system in the country. But instead of being a more passive entity in schools, they have gradually become mentors to students, adding to their support network of teachers, parents, coaches, and other caring adults.

  • Illinois Elementary School Breaks Ground on Campus Expansion

    Heather Hill Elementary School, part of Flossmoor School District 161 in Palatine, Ill., recently broke ground on a new addition to the school focused on student support and security, according to a news release. The district partnered with Wold Architects & Engineers for the expansion as part of a longer-term facility planning and modernization initiative.

  • Greenheck Debuts New Energy Recovery Ventilator

    Greenheck recently released a new energy recovery ventilator, the ERVi, designed for small indoor spaces like basements and mechanical rooms, according to a news release. The hardware can fit through a 30-inch door and be mounted on the ceiling for retrofit and decarbonization projects.