Clover Replacement Middle School and New Elementary School Set to Begin Construction

Town of Clover, S.C. – Grading permits have been obtained and early site work is set to begin shortly for two new schools in the Clover School District, SC. The first is a new middle school on an undeveloped site at the intersection of Highway 55 and Barrett Road to replace the currently-operating Clover Middle School, at an estimated cost of $40 million dollars. The second is for a New Elementary School located on Oakridge Road, across the street from the existing Oakridge Middle School Site.

Timmons Group has teamed with LS3P Associates, LTD, and Moseley Architects, respectively, to prepare the site design for the building layouts, pedestrian circulation systems, car and bus drop-offs, athletic fields and running tracks, and utility and stormwater plans for the two schools. The plans for the middle school are similar to Lake Wylie’s Oakridge Middle School that opened in 2009, with growth capacity for up to 1,200 additional students. The elementary school is a new prototype developed for the school district.

Brian Crutchfield, PE, is the Timmons Group principal currently working on these projects. “We’re very pleased to see the early site package permits have been approved and construction can begin on the schools,” he said in a statement. “We will remain actively involved with the projects as Construction Documents for the building packages are completed, and those portions of the projects are bid out this fall. We are working towards a Fall 2016 opening date for both schools.”

In a survey of nearly 2,000 respondents, over 75% said they strongly favor the new middle school’s addition to the school system, and are pleased that the project is underway. Both schools are a part of multiple projects that were approved by a March 2014 bond referendum that includes two new schools, renovations to existing schools, and a new aquatic and fitness center.

About Timmons Group
Timmons Group is a multi-disciplined engineering and technology firm recognized for nearly twenty years as one of Engineering News Record’s (ENR) Top 500 Design Firms in the country. The firm provides economic development, civil engineering, environmental, GIS/geospatial technology, landscape architecture and surveying services to a diverse client base. Headquartered in Richmond, Virginia, Timmons Group has regional offices throughout Virginia and North Carolina. For more information, visit www.timmons.com.

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • i-PRO, NovoTrax Partner for New School Emergency Response Solution

    i-PRO Americas, Inc., which manufactures edge computing cameras, recently announced a partnership with NovoTrax, provider of end-to-end life safety and mass notification solutions, to address gaps in emergency response workflows at K–12 schools, according to a news release.

  • University of Kentucky Integrates New Cleaning Technology

    The University of Kentucky in Lexington, Ky., recently installed a new cleaning system designed to improve cooling efficiency on campus, according to a news release. The Facilities Management’s Utilities and Energy Management Unit installed new chiller tubes into two of the chillers at the university’s Central Utility Plant.

  • Beeville ISD Starts Construction on New Elementary School

    The Beeville Independent School District near Corpus Christi, Texas, recently began a construction project that will consolidate two existing, aging schools into a new elementary school, according to a news release. The district is partnering with Pfluger Architects and Spawglass General Contractors for the design and construction, respectively, of the new facility.

Digital Edition