Coppin State University

Project Snapshot

PROJECT: Physical Education Complex
INSTITUTION: Coppin State University
LOCATION: Baltimore, MD
COMPANY NAME: Stonhard
WEBSITE: www.stonhard.com

THE CHALLENGE

In February 2010, after five years of planning and construction, Coppin State unveiled its brand new, 246,000-square-foot Physical Education Complex. The $136-million visionary facility includes a 4,100-seat basketball arena, an NCAA regulation pool, a fitness center, an auxiliary gymnasium, a dance studio, racquetball courts and classrooms, as well as many outdoor fields and recreation areas.

When plans were drawn up for the design of the basketball arena, polished concrete floors were specified for corridors, lobbies and locker rooms. However, as work began, project managers were extremely unhappy with the unsatisfactory appearance of the first applications in the locker rooms and put a halt to the entire installation.

Coppin State University

Coppin State University

Coppin State University

The installation of decorative, eye-catching floors in Coppin State University’s Physical Education Complex’s lobbies, concourses, walkways and other spaces have had positive results, Facility planners and project managers were very satisfied by the quick and cost-effective remediation of the flooring during construction.

THE SOLUTION

Finding themselves in an unexpected situation and drawing from numerous previous positive experiences with Stonhard, the project superintendent reached out to the company for guidance. Stonhard guaranteed a long-lasting decorative floor system that could be installed quickly and at a fraction of the cost of the originally specified polished concrete.

Stonhard recommended Stonproof ME7 as a crack-bridging agent on the surface of the concrete substrate, followed by Stonhard’s TecTop UF system. The Stonproof ME7 filled all cracks in the floor surface a smooth surface for the next steps in the installation process. TecTop UF creates a seamless, stain resistant floor surface that is durable and requires little maintenance. A colored epoxy undercoat and a layer of colorful, broadcasted vinyl flakes, finished off with a clear urethane sealer, resulted in decorative, eye-catching floors in the complex’s new lobbies, concourses, walkways, restrooms, locker rooms and pool observation deck.

IMPACT ON LEARNING

Coppin State sets for itself a broad mission — a central aspect of which is to offer educational access to students whose promise may have been hindered by a lack of social, personal or financial opportunity. Primarily a commuter institution serving a local population of mostly first-generation college students, the university anticipates a 25 percent growth in enrollment over roughly 10 years. Accomplishing this mission is achieved, in part, by developing top-notch facilities. The Stonhard floors in the Physical Education Complex contribute to the university’s goals, withstand heavy traffic and wear and tear and provide an easy-to-clean surface.

Editor's Review

Top-rate facilities that are attractive, safe and easy to maintain are an integral part of any institution’s goal to recruit and retain students and provide them with a solid education. Coppin State University’s focus on developing outstanding facilities for its students with attention to detail that extends to interior features, including flooring, speaks well of its commitment to quality.

This article originally appeared in the issue of .

Featured

  • Greenheck Debuts New Energy Recovery Ventilator

    Greenheck recently released a new energy recovery ventilator, the ERVi, designed for small indoor spaces like basements and mechanical rooms, according to a news release. The hardware can fit through a 30-inch door and be mounted on the ceiling for retrofit and decarbonization projects.

  • Texas School District Opens New Elementary School

    The Boerne Independent School District (Boerne ISD) near San Antonio, Texas, recently opened a new elementary school that serves almost 500 students, according to a news release. The district partnered with Pfluger Architects to build the 97,151-square-foot Viola Wilson Elementary School, which opened in August.

  • Minnesota High School Completes $226M Addition, Renovation Project

    White Bear Lake Area High School – North Campus in White Bear Lake, Minn., recently announced the completion of a $226-million renovation and addition project, according to a news release. The district partnered with Kraus-Anderson for the project’s construction, which involved creating a single high-school site for the White Bear Lake Area School District.

  • New Jersey High School Debuts Auditorium Renovation, Technical Upgrades

    Plainfield High School in Plainfield, N.J., recently completed a series of construction projects including an auditorium renovation, a new eSports gaming arena, and a black-box theater, according to a news release. The school partnered with PureTek Group to install the Pliant Technologies CrewCom professional wireless intercom system.

Digital Edition