Purdue University

Project Snapshot

PROJECT: Hicks Library
INSTITUTION: Purdue University
LOCATION: West Lafayette, IN
COMPANY NAME: Connectrac
WEBSITE: www.connectrac.com

THE CHALLENGE

Since 1998, Advanced Engineering Consultants (AEC) has provided quality engineering design services through creative thinking and stellar customer service. Their reputation preceded them when they were hired on to design the power and data distribution within the Hicks Undergraduate Library at Purdue University.

For over 30 years, the Hicks Library has served as a primary outlet for student research and study. Aspiring to create a more active learning environment, Purdue University looked to AEC to design computer stations and study tables with technological access non-adjacent to the library’s walls and columns. The big challenge for the project would be figuring out how to configure power and A/V connectivity throughout the workspace compatible with the library’s layout.

The job required extensive installation to be completed without disturbing the highly populated area. Core drilling or trenching caused too much of an intrusion to students and faculty as well as being unadaptable if the library needed future renovations.

Purdue University

Purdue University

The big challenge inherent in a technology upgrade to Hicks Library on the campus of Purdue University was figuring out how to configure power and A/V connectivity throughout the workspace that would be compatible with the library’s layout. With Connectrac’s ultra-low-profile wireways, the project was completed quickly and efficiently while maintaining the integrity of the library.

THE SOLUTION

In preparation for the installation, AEC discovered that Connectrac’s ultra-low-profile wireways could merge seamlessly with the library’s layout. With Connectrac In-Carpet Wireway, AEC could provide a quick and efficient installation while maintaining the integrity of the library. “The Wireway’s slim profile and design aesthetic was compatible with the direction of the project,” says Dan James, project manager and senior electrical designer at AEC.

AEC also used Connectrac’s 12-foot wall channel to travel up each column in the library to ensure power and A/V access to every workstation.

“Overall, the solution Connectrac provided was much better than the visual clutter power/data poles would have created within the space,” adds Jeremy Hatfield, principal of AEC. “It will be a future ‘go to’ solution.” A new standard in power and technology connectivity has been set through Connectrac ultra-low-profile wireways.

IMPACT ON LEARNING

Advanced Engineering Consultants completed the project without a hitch. Thanks to their work along with the use of Connectrac wireways, Hicks Library increased productivity and connectivity while keeping an elegant, simple aesthetic. “There was much to work around in Advanced Engineering’s project,” says Steve Batchelder, Connectrac’s director of sales. “But finding the new standard in connectivity in Connectrac, they were able to accomplish the installation without disturbing student workflow or having to change the layout of the library.” No longer are universities tied down with expensive and irreplaceable core drilling or unsightly power poles when retrofitting their campus for technology.

Editor's Review

Amid restricted budgets and increased scrutiny on rising costs, colleges and universities must allocate their resources carefully while continuing to offer the best educational quality to students. They must also stay abreast of technology. This retrofit project at Purdue University’s Hicks Undergraduate Library took into account budget and technology, and also resulted in a low-impact interruption to both the facility and daily operations. The result is a much-improved space for students.

This article originally appeared in the issue of .

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Texas A&M Opens First Building at Fort Worth Campus, Breaks Ground on Research Facility

    The Texas A&M University System marked a major milestone in the development of its Fort Worth campus by opening its first completed academic building and breaking ground on a second facility designed to expand research and industry collaboration.

  • Minnesota District Converts Middle School into Community Hub

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced the end of a major renovation project that converted a former middle school into a new centralized district and community hub, according to a news release.