Dance Floors vs. Sports Floors

The athlete stutter steps and dribbles from baseline to baseline, usually protected by cushioned footwear. The dancer jumps and turns from stage right to stage left, often barefoot or wearing soft dance shoes. The movements and performers are different; shouldn’t the floors be different too?

While it might seem logical that a well-designed sports floor will suit the needs of elite, athletic dancers, there are several factors that should be considered when specifying a dance floor.

Construction of a sprung subfloor for a sports floor is typically firm with a high degree of energy return, ideal for ball bounce and athletes wearing cushioned footwear — a luxury barred to most dancers. Dancers prefer a sprung subfloor with a combination of shock absorption and energy return that will ease pressure on their joints and cushion landings.

After deciding on a subfloor, the next thing to consider is performance surface. Here the top priority for dancers is slip resistance to protect against slips and falls. Although athletes share those same risks, they need a surface that doesn’t block movements and are again usually protected by footwear.

To ensure you select the correct floor for your facility, start by answering the following questions: What types of dance will primarily be performed? Will the floor be in a multipurpose or theatre facility? Is the subfloor concrete, wood, sprung? Is the floor to be permanent or portable? Are the ceilings high enough?

Dancers spend significant hours practicing and performing, whether in a studio or on stage. Choosing the right floor for your dance or performing arts program will instill confidence, creativity and protection for all students.

This article originally appeared in the issue of .

About the Author

Christine Ott is marketing director for Harlequin Floors.

Featured

  • Pittsburgh High School Upgrades Athletics Facilities’ Technology

    Plum Senior High School in Pittsburgh, Penn., recently partnered with South-Dakota-based Daktronics through the We’re All Mustangs Here Foundation to upgrade the technology in its athletics facilities, according to a news release. Daktronics designed, built, and installed new LED video displays and finished the project in time for the beginning of the 2025 high-school football season.

  • Epson Receives Seven AV Industry Awards

    Projectors manufacturer Epson recently announced that it received multiple awards across the Higher Ed AV Awards, SCN Stellar Service Awards, and InfoComm 2025, according to a news release. The company was recognized for three projectors from its PowerLite L-Series line, accessories, installation process, and its customer support team.

  • University of Southern Mississippi Starts Construction on Oyster Hatchery

    The University of Southern Mississippi (USM) recently announced that construction has begun on a new oyster hatchery at its Gulf Coast Research Laboratory (GCRL) Thad Cochran Marine Aquaculture Center (TCMAC) Cedar Point campus in Ocean Springs, Miss., according to a news release.

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

Digital Edition