Coppin State University

Project Snapshot

PROJECT: Long-Lasting Floor System
INSTITUTION: Coppin State University
LOCATION: Baltimore, MD
COMPANY NAME: Stonhard
WEBSITE: www.stonhard.com

Long-Lasting Floor System

The installation of decortive, eye-catching floors in Coppin State University’s Physical Education Complex’s lobbies, concourses, walkways and other spaces have had positive results. Facility planners and project managers were very satisfied by the quick and cost-effective remediation of the flooring during construction.

THE CHALLENGE

In February, 2010, after five years of planning and construction, Coppin State unveiled its brand new, 246,000 square foot Physical Education Complex. The $136 million, visionary facility includes a 4,100-seat basketball arena, an NCAA regulation pool, a fitness center, an auxiliary gymnasium, a dance studio, racquetball courts and classrooms, as well as many outdoor fields and recreation areas.

When plans were drawn up for the design of the basketball arena, polished concrete floors were specified for corridors, lobbies and locker rooms. However, as work began, project managers were extremely unhappy with the unsatisfactory appearance of the first applications in the locker rooms and put a halt to the entire installation.

Long-Lasting Floor System

THE SOLUTION

Finding themselves in an unexpected situation and drawing from numerous previous positive experiences with Stonhard, the project superintendent reached out to the company for guidance. Stonhard guaranteed a long-lasting decorative floor system that could be installed quickly and at a fraction of the cost of the originally specified polished concrete.

Stonhard recommended Stonproof ME7 as a crack-bridging agent on the surface of the concrete substrate, followed by Stonhard’s TecTop UF system. The Stonproof ME7 filled all cracks in the floor surface a smooth surface for the next steps in the installation process. TecTop UF creates a seamless, stain resistant floor surface that is durable and requires little maintenance. A colored epoxy undercoat and a layer of colorful, broadcasted vinyl flakes, finished off with a clear urethane sealer, resulted in decorative, eye-catching floors in the complex’s new lobbies, concourses, walkways, restrooms, locker rooms and pool observation deck.

Long-Lasting Floor System

IMPACT ON LEARNING

Coppin State sets for itself a broad mission — a central aspect of which is to offer educational access to students whose promise may have been hindered by a lack of social, personal or financial opportunity. Primarily a commuter institution serving a local population of mostly first-generation college students, the university anticipates a 25 percent growth in enrollment over roughly 10 years. Accomplishing this mission is achieved, in part, by developing top-notch facilities. The Stonhard floors in the Physical Education Complex contribute to the university’s goals, withstand heavy traffic and wear and tear and provide an easy-to-clean surface.

Editor’s Review

Top-rate facilities that are attractive, safe and easy to maintain are an integral part of any college or university’s goal to recruit and retain students and provide them with a solid education. Coppin State University’s focus on developing outstanding facilities for its students with attention to detail that extends to interior features, including flooring, speaks well of its commitment to quality.

This article originally appeared in the issue of .

Featured

  • 144-Year-Old High-School Campus Debuts New Academic Facility

    San Diego High School (SDHS) in San Diego, Calif., recently held a ribbon-cutting ceremony for a new student services and classroom building; the project is part of a larger SDHS Whole Site Modernization project that began in 2022.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • Benson Polytechnic High School in Portland, OR

    Preserving Legacy, Designing for the Future

    As historic academic buildings age, institutions face a difficult decision: preserve and adapt or demolish and rebuild. How do we honor the legacy of these spaces while adapting them to meet the needs of modern learners?

  • Zurn Elkay Releases 2025 Sustainability Report

    Zurn Elkay Water Solutions recently announced the release of its annual sustainability report, according to a news release. The 2025 report discusses the organization’s efforts to maintain good environmental stewardship and the solutions provided in helping customers meet sustainability goals.