Peoria Unified School District

Project Snapshot

PROJECT: Sustainable Solutions for School Maintenance and Management
DISTRICT NAME: Peoria School District
LOCATION: Glendale, Ariz.
COMPANY NAME: Air Cycle Corporation
WEBSITE: www.AirCycle.com

disposal of fluorescent lamp waste

The challenges experienced with K-12 School Districts of any size, like the Peoria Unified School District in Arizona, are managing the disposal of fluorescent lamp waste. Lamps contain mercury, their proper management and disposal is regulated by the EPA, so they must be handled in the correct manner.

THE CHALLENGE

The Peoria School District has over 40 campuses and several support facilities that require time, storage space and associated costs with the proper collection and disposal of intact spent lamps.

“The problem we were encountering at our school district, was the burden with the amount of used fluorescent lamps being stored. We did not have an in house program for the disposal of fluorescent lamps and the expense of packaging the used lamps to send out for proper disposal was excessive,” says Roy Rose, buildings and shop supervisor at Peoria.

THE SOLUTION

A few different solutions exist for proper management and handling of lamp waste depending on the size of the school district. Facilities over 200,000 square feet benefit greatly from using a drum-top lamp crushing system such as the Bulb Eater 3 (BE3) to save space, time, costs and ensure worker safety. The unit is a high quality product that is compact and allows for many different lamp types. The system will allow lamps to be crushed and stored in a proper way until the drums are full and recycled.

This solution allows for the elimination of intact fluorescent lamps being stored in a potentially hazardous situation while providing facility safety from accidental breakage. Valuable storage space will be free from unnecessary boxes of spent fluorescent lamps and allows for the lamp waste to be recycled at a much lower cost.

disposal of fluorescent lamp waste

IMPACT ON LEARNING

The Peoria Unified School District utilized Air Cycle’s services and BE3 machine to efficiently control the amount of spent lamps required for proper disposal from over 40 campuses and several support facilities. This eliminated the need to store the used lamps, waiting for a required amount to package and ship out for recycling, while ensuring facility safety.

“I would recommend Air Cycles services to any facility for significant cost savings. We have saved thousands of dollars in a short period of time, reduced the amount of labor required for managing spent lamps, and gained storage space no longer consumed with boxes of lamps. The machine was a huge benefit to our facilities, safe to use, and simple to operate,” says Rose. IOL

Editor’s Review

Management and disposal of fluorescent light bulbs and other mercury-containing bulbs are regulated under the Resource Conservation and Recovery Act (RCRA) Universal Waste Rule (UWR) and Subtitle C hazardous waste regulations. The EPA is concerned about the release of mercury into the environment. Recycling fluorescent bulbs allows the reuse of the glass, metals and other materials that make up fluorescent lights. Virtually all components of a fluorescent bulb can be recycled. So the district should be acknowledged for finding a way to act responsibly and save costs, which means that those dollars can be used for direct education expenses.

This article originally appeared in the issue of .

Featured

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

  • Epson Receives Seven AV Industry Awards

    Projectors manufacturer Epson recently announced that it received multiple awards across the Higher Ed AV Awards, SCN Stellar Service Awards, and InfoComm 2025, according to a news release. The company was recognized for three projectors from its PowerLite L-Series line, accessories, installation process, and its customer support team.

  • North Dakota State University Completes Music School Renovation

    North Dakota State University in Fargo, N.D., recently announced that construction on the Challey School of Music has finished, according to a news release. The university partnered with Foss Architecture & Interiors for design and Kraus-Anderson for construction services, and construction began in July 2024.

  • illustration of a school building under construction

    One District, One Way: Bringing Consistency to K–12 Construction Projects

    From budgeting to closeout, here's how a single playbook can turn chaos into clarity in school construction programs.

Digital Edition