I Can Hear Clearly Now

Hear Clearly

PHOTO © D13

While kids frequently leave you with the impression that they don’t notice anything that isn’t on their smart phone or screeching at them from a television set, that isn’t necessarily so. Sometimes even seemingly subtle changes can produce profound differences and, ultimately, recognition from usually oblivious youth.

Take a roomful of sixth graders at the Robert E. Lamberton Public School in Philadelphia. Dr. Kenneth Roy, senior principal research scientist at Armstrong Ceiling Systems, conducted a test at the school involving the acoustics in that sixth grade classroom. The class was videotaped; however, the teacher was the only one in the room told the reason for doing so.

Prior to making any changes in the room, Dr. Roy took sound measurements in the classroom. The existing classroom ceiling consisted of one-half inch thickness of fiberglass insulation sprayed over plaster. The reverberation rate of sound in the room, he discovered, was up to 1.3 seconds, far exceeding classroom acoustic (ANSI S12.60) standards. The sound was, quite literally, bouncing off the ceiling and walls.

Taking advantage of a long weekend, Armstrong installed a suspended acoustic panel ceiling in the classroom. New ceilings also were installed in the school’s cafeteria and the principal’s office.

When the sixth grade students returned to class, new sound measurements were taken. This time, the classroom met the ANSI standard for sound reverberation of 0.60 seconds.

The teacher indicated there appeared to be less fidgeting and talking during lessons. Her students seemed to be paying more attention. What was even more interesting was the reaction of the students. When asked if they’d noticed any changes, there was an immediate response — they noticed the improvement in the sound levels. Several also commented that the room was a lot brighter, and yet another student, who sat in the back of the room, said “I can hear (my teacher) a lot better today.”

This article originally appeared in the issue of .

Featured

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.

  • University of Pittsburgh to Build New Residence Hall

    The Board of Trustees from the University of Pittsburgh in Pittsburgh, Penn., recently approved the construction of a new residence hall for first-year students, according to university news.

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Stanford Online Reveals New Immersive Learning Studio

    Stanford Online recently marked its 30th anniversary with the announcement of a new immersive learning studio, according to a university news release. The studio takes advantage of AI-powered and immersive learning technologies to continue delivering personalized and faculty-led education.