CannonDesign Releases Infographic to Better Help Universities Obtain More R&D Funding

WASHINGTON, DC – CannonDesign, a global design firm ranked among the top 10 S&T design firms in the world, has released a new infographic that helps universities wanting to obtain more R&D funding navigate the federal grants process.

Funding challenges are a major concern for many institutions around the United States. Institutions are tasked with securing hundreds of thousands to millions of dollars in grants each year to continue their important R&D work. 

“We realized during our research that there were two roadblocks for universities when applying for grants,” says Stephen Blair, CannonDesign's executive director of Science and Technology. “The first roadblock was that universities sometimes overlook grants offered through different federal agencies.” A total of 14 federal agencies support R&D funding through facilities construction, renovation and major capital equipment, including some not commonly known for grant funding, including the Department of Agriculture and NASA.

“The second roadblock for many universities is navigating the design requirements necessary to prove their facility will remain viable to conduct the research within,” says Blair. “I've seen universities try and use their undergraduate architect students to design a preliminary facilities plan, and this never turns out well.”

For construction, renovation and equipment grant applications, the requirements include engineering criteria, architectural criteria, line drawings, timelines, construction documents, equipment plans, operating budgets and more. With hundreds of institutions competing for a limited amount of funding, the way you present the facility design plays a pivotal role in setting the top applications apart from the rest.

CannonDesign has created an infographic of their research findings including the top grants and their issuing agencies as well as more information about the design requirements necessary for a successful application. Download the free infographic here: www.cannondesign.com.

Featured

  • AP Construction Breaks Ground on Two Projects for Austin ISD

    Adolfson & Peterson Construction (AP) recently announced that it has broken ground on two renovation projects for the Austin Independent School District, according to a news release. The work at McCallum and Anderson High Schools totals 97,350 square feet and is scheduled for completion in January 2027.

  • Zurn Releases New Ductile Iron Frame Trench Drain System

    Zurn Elkay Water Solutions recently released the newest addition to its Train Drench portfolio, the Ductile Iron Frame Trench Drain System, according to a news release. The product is designed for heavy-duty applications like airports, military, universities, and more.

  • Gretna East High School

    Gretna East High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Gretna East High School has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

  • Greenheck Launches Optics Sensors for Kitchen Hoods

    Greenheck recently announced the launch of factory-installed optics sensors as an enhanced option for its kitchen ventilation hoods, according to a news release.

Digital Edition