McREL Study Finds Link Between School Climate and Literacy Achievement

A study taking a closer look at the relationship between staff survey results and student performance at elementary schools across the state of Victoria, Australia, found a statistically significant link between school climate and achievement in literacy at the 5th grade level.

The predictive validity study, conducted by McREL researcher Tedra Clark and Roger Goddard of Ohio State University, focused on the effects on student achievement of five vital areas of school functioning: school climate; school leadership; professional learning; staff safety and well-being; and teaching and learning.

Teachers at 82 elementary and secondary schools across Victoria were asked about these five areas on a school staff opinion survey that McREL developed for the state’s Department of Education and Training. Further investigation showed that, though all five areas were highly interrelated and positively connected to student outcomes in literacy and numeracy, the most significant finding was that staff perceptions of school climate were predictive of 5th grade literacy achievement.

Using various statistical models, the researchers were able to “unpack” this relationship and found that the link occurs on a mediated path: Strong leadership at the school level led to better teacher collaboration and academic optimism, which led to literacy achievement. In other words, school leadership predicts student literacy scores through greater teacher collaboration and academic optimism.

This connection explained over 75 percent of the school-to-school variance in literacy achievement, said Clark. “This model is not only statistically strong,” she said, “but also holds up in different contexts and with different student populations.”

According to McREL Chief Program Officer Robin Jarvis, these findings also support the value of using multiple measures, such as climate surveys, not only to understand the factors affecting student achievement but also “to measure changes in those leading achievement indicators in order to intervene, when necessary, to ultimately improve student achievement.”

For more information on the school climate survey and results analysis, please visit www.mcrel.org/success-stories.

Featured

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

  • restroom sinks

    CSU Dominguez Hills Standardizes Plumbing to Improve Restroom Maintenance and Efficiency

    At California State University, Dominguez Hills, facilities leaders have taken steps to standardize restroom fixtures as part of a broader effort to improve maintenance efficiency and control long-term costs.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

Digital Edition