Students Win National Design Competition for Future Missions to Mars

Los Angeles — (Business Wire) — The American Society of Mechanical Engineers (ASME) Foundation is on a mission to propel the future of advanced manufacturing research, while NASA is developing mission critical 3-D printing technologies needed for humans to explore destinations far beyond Earth, including Mars. Together, they invited K-12 students to engineer the future of 3-D printing in space by issuing their fifth student innovation challenge, this time with a focus on medicine and Mars.

Future Engineers, the online host for the innovation challenge series, is proud to announce the two winners of the Mars Medical Challenge: Lewis Greenstein, 18, of Seattle, Wash. and Lauren Lee, 12, of Cupertino, Calif. Students were tasked to create a digital model of a medical or dental object that could be 3-D printed by an astronaut to maintain physical health on a three-year, round trip mission to the Red Planet. Uses could include: diagnostic, preventative, first aid, emergency, surgical and/or dental purposes. This challenge placed K-12 classrooms squarely in the middle of problem solving for this important scientific mission.

Out of 745 submitted designs from 34 states, a panel of experts selected one national winner from each age division. The winner from the Teen Group (ages 13-19) is the Dual IV/Syringe Pump designed by Greenstein and the winner of the Junior Group (ages 5-12) is the Drug Delivery Device designed by Lee. In recognition of their accomplishments, each winner and one parent will be flown to Houston, Texas for a tour of NASA’s Johnson Space Center to learn more about space medicine, human space exploration and Mars. In addition to this grand prize, a MakerBot 3-D printer will be donated to the education organization of their choice, engaging thousands more students with 3-D printing technology as a result of their achievements.

“It is inspiring to see these two students use 3-D printing to innovate something truly unique in space travel,” said Deanne Bell, CEO and founder, Future Engineers.“This ongoing collaboration between the ASME Foundation and NASA catapults our youth into another realm of science and engineering expertise. I am happy that our platform continues to challenge students to dream big and think off-planet.”

Lee’s Drug Delivery Device is a fully-3-D printable spring loaded syringe, while Greenstein leveraged his experience volunteering in medical clinics to invent his Dual IV/Syringe Pump, a system which uses a blood pressure cuff as the driving force to administer intravenous fluids in microgravity.

For Greenstein, this was his first time using 3-D design software. He learned the skill through an Innovations Prototype class he took at his school - Seattle Academy. “I am very honored, especially because it was my first time using CAD software,” he said.

Both students started with sketches to refine their idea and create their designs.

“I was inspired by many different things, such as oral syringes and ballpoint pens,” said Lee. “I started designing by sketching out my thoughts and ideas on paper. Then, I started learning new software programs.”

To learn more about the Future Engineers 3-D Space Challenges, information on how to enter or the judging criteria, visit www.FutureEngineers.org.

Featured

  • Greenheck Debuts New Energy Recovery Ventilator

    Greenheck recently released a new energy recovery ventilator, the ERVi, designed for small indoor spaces like basements and mechanical rooms, according to a news release. The hardware can fit through a 30-inch door and be mounted on the ceiling for retrofit and decarbonization projects.

  • Texas School District Opens New Elementary School

    The Boerne Independent School District (Boerne ISD) near San Antonio, Texas, recently opened a new elementary school that serves almost 500 students, according to a news release. The district partnered with Pfluger Architects to build the 97,151-square-foot Viola Wilson Elementary School, which opened in August.

  • Minnesota High School Completes $226M Addition, Renovation Project

    White Bear Lake Area High School – North Campus in White Bear Lake, Minn., recently announced the completion of a $226-million renovation and addition project, according to a news release. The district partnered with Kraus-Anderson for the project’s construction, which involved creating a single high-school site for the White Bear Lake Area School District.

  • New Jersey High School Debuts Auditorium Renovation, Technical Upgrades

    Plainfield High School in Plainfield, N.J., recently completed a series of construction projects including an auditorium renovation, a new eSports gaming arena, and a black-box theater, according to a news release. The school partnered with PureTek Group to install the Pliant Technologies CrewCom professional wireless intercom system.

Digital Edition