Crandall ISD High School Begins Expansion Project

Crandall ISD High SchoolAs a part of a 2017 bond program, Crandall (Texas) ISD has teamed with WRA Architects to design two new additions and renovations to the existing high school. This expansion will include a 3,000-square-foot cafeteria and 43,000-square-foot classroom addition increasing the capacity by 450 students.

The addition will provide much needed classroom space to house the growing population. It will boast Next Generation Learning environments that promote collaboration between students as well as teachers. Large overhead doors will help create transparency between surrounding classrooms and the multipurpose space, thus helping to encourage the free exchange of ideas through group learning. Movable seating and furniture will be provided with plenty of outlets for charging the technology used by students at Crandall ISD. Seventeen new classrooms will be outfitted with movable desks encouraging collaborative learning.

Four new physics and biology science labs with shared prep rooms will have built in perimeter casework with mobile tables making the space flexible for different teaching strategies. Curriculum will be taught in new culinary, interior design and medical areas. To simulate real world medical practice, classrooms will have flexible learning spaces with patient beds and phlebotomy stations.

The exterior masonry on the classroom addition will respect the original design by following the same details and patterns. At the cafeteria addition, a more contemporary design was chosen with full height glass curtain wall and a deep overhanging roof structure, supported by elegant round columns. Similar masonry details will be used along with blue window mullions to tie the addition into the existing building.

An outdoor plaza area will be located to the west of the addition to provide a space for people to congregate before and after events held in the newly expanded cafeteria. This space should become an extension of the cafeteria due to the transparency between the interior and exterior environments. Inside the space, 175 additional occupants will be able to dine through a mix of table seating and stand-up bar space. A fourth serving line will provide to address additional serving needs.

The additions will promote next generation learning and will increase their dining and performing arts capabilities. Crandall ISD’s newly expanded High School campus will be an attractive and functional addition to the school district and community.

To learn more, visit WRA Architects at www.wraarchitects.com.

Featured

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • golden trophies with falling confetti

    Spaces4Learning Launches 2026 New Product Awards

    Spaces4Learning is happy to announce that we’re now accepting entries for the 2026 New Product Awards! The awards program recognizes the outstanding product development achievements of manufacturers and suppliers whose products or services are considered particularly noteworthy.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.