Crandall ISD High School Begins Expansion Project

Crandall ISD High SchoolAs a part of a 2017 bond program, Crandall (Texas) ISD has teamed with WRA Architects to design two new additions and renovations to the existing high school. This expansion will include a 3,000-square-foot cafeteria and 43,000-square-foot classroom addition increasing the capacity by 450 students.

The addition will provide much needed classroom space to house the growing population. It will boast Next Generation Learning environments that promote collaboration between students as well as teachers. Large overhead doors will help create transparency between surrounding classrooms and the multipurpose space, thus helping to encourage the free exchange of ideas through group learning. Movable seating and furniture will be provided with plenty of outlets for charging the technology used by students at Crandall ISD. Seventeen new classrooms will be outfitted with movable desks encouraging collaborative learning.

Four new physics and biology science labs with shared prep rooms will have built in perimeter casework with mobile tables making the space flexible for different teaching strategies. Curriculum will be taught in new culinary, interior design and medical areas. To simulate real world medical practice, classrooms will have flexible learning spaces with patient beds and phlebotomy stations.

The exterior masonry on the classroom addition will respect the original design by following the same details and patterns. At the cafeteria addition, a more contemporary design was chosen with full height glass curtain wall and a deep overhanging roof structure, supported by elegant round columns. Similar masonry details will be used along with blue window mullions to tie the addition into the existing building.

An outdoor plaza area will be located to the west of the addition to provide a space for people to congregate before and after events held in the newly expanded cafeteria. This space should become an extension of the cafeteria due to the transparency between the interior and exterior environments. Inside the space, 175 additional occupants will be able to dine through a mix of table seating and stand-up bar space. A fourth serving line will provide to address additional serving needs.

The additions will promote next generation learning and will increase their dining and performing arts capabilities. Crandall ISD’s newly expanded High School campus will be an attractive and functional addition to the school district and community.

To learn more, visit WRA Architects at www.wraarchitects.com.

Featured

  • St. John Fisher University

    Classroom Revitalization – Basil Hall Room 216

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. St. John Fisher University's Basil Hall Room 216 Classroom Revitalization has been recognized with an EDS 2026 Project of Distinction award in the category of Spaces.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Higher Ed is Betting on New Buildings While Quietly Undermining Their Campuses — Here’s Why

    In this climate, the owner’s representative has changed from a delivery-focused advisor to a strategic campus partner. Institutions are increasingly relying on owner’s reps not just to manage, cope, schedule, and budget, but also help evaluate whether a project should proceed at all.