Glazed Brick

Brick has been proven for centuries and offers superior protection over other wall cladding material, making it the ideal choice for schools and other large, noteworthy buildings. Like traditional brick, glazed brick units have been an integral part of buildings for hundreds of years and have performed well under all climatic conditions. Glazed brick can be used on both interior and exterior settings, as accent brick or as the field brick covering an entire façade.

Glazed brick can present a bright, bold, colorful statement while maintaining the durability of a brick. Clear glazes can also be applied to traditional brick, delivering the same unique glazed advantages to standard brick colors.

A glaze is a vitrified coating bonded to the surface of an extruded brick. During a single-fire process, the brick unit and a ceramic glaze coating are fired at the same time, causing a fired bond between the glaze and the brick unit, making them far superior to double-fired products. Double-fired glazes have physical properties which are inferior to those of single-fired glazes due to a lower firing temperature during the second fire.

The resulting product displays a hardened surface that’s integrated into the surface of the brick and is the ideal means for adding a gorgeous finish and color to any educational setting.

Glazed brick offers the means to choose from an infinite array of colors — custom color options means schools and colleges can match paint and Pantone swatches that scream school spirit. Glazed brick is virtually maintenance free; the bricks will never discolor, peel or need to be painted. Attractive features of glazed products also include:

  • Impervious to liquids and gases
  • Long-lasting, consistent and non-fading colors
  • Graffiti- and abrasion-resistant

This article originally appeared in the issue of .

About the Author

Tim Leese is marketing services manager for Glen-Gery. He can be contacted at [email protected].

Featured

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • Chicago District Completes Construction on New Elementary School

    North Chicago School District 187 in North Chicago, Ill., recently held a ribbon-cutting ceremony for the new Forrestal Elementary School, according to a news release. The new school marks a major investment in military-connected students and families at Naval Station Great Lakes.

  • Classical building columns display digital data streams

    The Campus Nervous System: Why Facilities Risk Is Now a Leadership Issue in Higher Education

    Facility performance now intersects with safety, compliance, on-campus experience, institutional reputation, and financial resilience. That places it firmly on the leadership agenda.

  • Hawaii Elementary School Reopens Following $25M Campus Modernization

    Haʻaheo Elementary School in Hilo, Hawaii, has reopened to students following a three-year, $25-million campus modernization and expansion project that significantly increases the school's instructional space while preserving one of the island's oldest educational institutions, according to local news.