Keeping Entrances Clean and Safe

Keeping your buildings clean and safe can be a challenge; utilizing a functional entrance flooring product at your entrances can make all the difference. This durable product is designed to protect entrances throughout a building, is located where building users frequently enter and exit, and is made from materials like aluminum or stainless steel.

Entrance flooring is designed to maintain a clean, safe entryway. As foot traffic enters the building, debris fall between the rails into the recessed area below. Trapping debris maintains surface traction and reduces slip/fall risks, especially in soggy conditions. To clean and maintain, facility crews simply roll back or lift the system to vacuum debris from the recessed area. This shortens cleaning time and creates a safer walkway. Because entrance flooring can either be recessed or surface-mounted, there is less risk for the product to dislodge and pose an additional threat.

An educational facility can encounter thousands of students and faculty each day. It could also see heavy machinery like scissor lifts, dollies, or vending machines. It is important to select entrance flooring that is proven to withstand heavy rolling loads and continual foot traffic. Many manufacturers have testing criteria available to help you to select the best option for your buildings. Rolling loads capabilities vary by product, ranging from 250 to 1,000 pounds per wheel.

Installing a permanent entrance flooring system keeps your building clean and safe by trapping dirt and debris, reducing the risk of slip/fall accidents, and standing up to heavy rolling loads. Remember to side with a manufacturer that has trustworthy products and services to ensure safety and durability.

This article originally appeared in the issue of .

About the Author

Wade Brown, LEED-AP, CDT, is the senior manager–Product Marketing for Construction Specialties (www.c-sgroup.com). He can be reached at [email protected] or 800/233-8493.

Featured

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • Pitzer College

    Designing for Change in Higher Ed Learning Environments

    Higher education will continue to evolve, and learning environments must evolve with it. By prioritizing adaptable infrastructure, thoughtful reuse, strong energy performance, and wellness-centered design, campuses can create spaces that support learning today while remaining flexible for the future.

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.