Arlington ISD’s New Agricultural Center Achieves Net-Zero Energy

Arlington, Texas – As the only net-zero building in the Arlington area, Arlington ISD’s Agricultural Science Center now utilizes a photovoltaic solar array and wind turbine to produce more energy than it consumes. Their new interactive dashboard, housed on a 55-inch touch screen, shows that the energy produced is high enough to push the surplus into the local power grid. This dashboard allows students and teachers to see how energy production works in real-time. The dashboard also shows how much energy is being used by different building systems such as HVAC or lighting at any given time.

Arlington ISD Agricultural Center

The new 28,000-square-foot ag center, designed by VLK Architects, has two classrooms, a metal lab, animal pens, and support areas. Because the dashboard is available online, teachers of all grade levels within the district can access the content which can then be utilized for various classroom instruction involving energy conservation as well as agriculture. Additional curriculum and instruction are being developed based on real-time data on weather and moon phases, local watershed information, animal life cycles, and interactive games which are embedded within the dashboard. Multiple elements of the building came to fruition during the design charrette which included students, AISD staff, and school board members. The result was a sustainability program and the potential future expansion of the center to accommodate growth and additional programs.

“Ideally, we would like to eventually include live feeds of the animals, if possible," said Danielle Reynolds, K-12 Science coordinator, AISD. “The idea is to help elementary and secondary students see the connectivity of living and non-living things in our environment."

The Net Zero Energy Building certification (NZEB) is a branch of the Living Building Challenge (LBC) that offers certification for buildings that supply on-site renewable energy for one hundred percent of the building’s energy needs on a net annual basis. The NZEB designation verifies that a building is truly operating as claimed, harnessing energy from the sun, wind or earth to exceed net annual demand.  To earn this certification, a building must actually meet five requirements of the LBC: Limits of Growth, Net Zero Energy, Rights to Nature, Beauty and Spirit, and Inspiration and Education.

Featured

  • Can AI Help Build Stronger Communities in Student Housing?

    Student housing success is shifting from operational performance to student experience, with belonging now at the center. A recent 2025 report underscores a growing emphasis on student well-being, community, and engagement, signaling that expectations now extend beyond logistics to ensure students feel supported in their living environments. AI is enabling that shift by reducing administrative workload and giving teams more time to focus on meaningful student engagement.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.