Student Union Renovation Begins at UMass Amherst

The Student Union building on the campus of the University of Massachusetts, Amherst, closed for renovation in January. The renovation has been designed by Shepley Bulfinch.

When the building reopens for the fall 2020 semester, most interior walls will have been removed and the interior generally repartitioned. The ballroom, now on the main floor, will be one floor higher and feature exposed columns and trusses.

UMASS Student Union

Students will find an active “Main Street” style promenade with concentrated retail, student services, and dining options, and there will be a new entry and outdoor plaza with a streamlined connection to the Lincoln Campus Center. Other renovations include:

  • A consolidated media center serving the Daily Collegian, UVC-TV19, and WMUA that is positioned so activity is visible from the “Main Street.”
  • Expanded student business space.
  • New meeting, activity, and assembly space.
  • Cape Cod Lounge will be repurposed into new, divisible, multipurpose areas for medium-sized assembly and function space.
  • Mechanical and electrical systems will be updated.

Featured

  • University of Illinois Moves Forward with College Sports’ Largest Digital Scoreboard

    The University of Illinois in Champaign, Ill., recently announced a series of upgrades to Gies Memorial Stadium that will include the largest scoreboard in college sports, according to a news release.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.