New Arizona High School Follows Academy Model

A high school scheduled to open this month near Phoenix in Arizona is following what it's calling an "academy-based, career-pathway focused education." Eastmark High School, part of the Queen Creek Unified School District in Mesa, will feature next-generation educational spaces as well as athletic and arts programs.

The campus is being built with a combination of voter-approved bond funds and state school facilities funding. Phase-1 of the project is 154,000 square feet with a capacity for about 1,350 students. The site is master planned for future phases to increase capacity to 2,700 to 2,800 students. The future spaces will accommodate an auxiliary gym, additional learning spaces, a performing and arts space and an auditorium.

The project broke ground in March 2018 on a 60-acre site. Orcutt | Winslow designed the high school, which is being built by Core Construction. According to local media coverage, the construction company used virtual reality technology to enable stakeholders to see what the new school would look like.

Students will attend classes within one of four distinct academies: STEM, medical and social health, business and marketing, and fine arts.

What's unique is that each academy will have its own space, which mimics what students would experience in the real world. As Principal Paul Gagnon explained in a video, the business and marketing students will be able to run a student store where they'll be able to market their materials. The fine arts students will work in an environment set up like a film and TV studio. The medical students will study in a space that mimics a hospital setting. And the STEM students will be "in an engineering lab where they can build things just like they would in any robotics-type setting."

As the academies grow, each will have dedicated specialists to serve as guidance counselors. Currently, the school is also seeking professional partnerships "so that our students can truly learn from the people that are doing the work out in the field and have access to that knowledge to make them more successful and more prepared for the future," said Gagnon.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.

  • Classical building columns display digital data streams

    The Campus Nervous System: Why Facilities Risk Is Now a Leadership Issue in Higher Education

    Facility performance now intersects with safety, compliance, on-campus experience, institutional reputation, and financial resilience. That places it firmly on the leadership agenda.

  • Q&A: How to Prevent Kitchen Grease Fires in Commercial Kitchens

    School cafeterias and university dining halls serve thousands of meals daily, relying on high-heat equipment like fryers, grills, and ovens. While these operations keep students fed, they also generate significant grease-laden vapors. Without proper controls, this grease becomes a silent fire threat. As a certified exhaust cleaning specialist and business coach who has helped hundreds of institutional facilities achieve NFPA 96 compliance, I emphasize that proactive grease management isn’t optional; it’s a core fire/life safety practice.

  • UT-San Antonio Begins Residence Hall Renovations

    The University of Texas at San Antonio recently began a $6-million renovation project to one of its residence halls, according to a news release. Originally completed in 1986, Chisolm Hall measures in at 120,860 square feet and is the oldest and largest residence hall on campus.