Palo Alto High School's Library Transformation

Palo Alto High School’s former library was described as “disjointed, dark and inefficient” by the school’s librarian. The library was located in a windowless space surrounded by private offices in a building built nearly 50 years ago. It was time for a change.

“The design team from HED considered the 1970s existing building and saw the opportunity for a dramatic transformation,” HED architect, Erwin Lee said.

The library’s transformation was the last major facility on campus to be funded through the $378 million Strong Schools Bond passed by voters in 2008.

Palo Alto High School staff envisioned a library that would feature updated technology, natural light, and a more functional, open layout with clear sightlines and improved circulation patterns.

Teacher/librarian Rachel Kellerman and Palo Alto High School staff envisioned a space that would feature updated technology, natural light, and a more functional, open layout with clear sightlines and improved circulation patterns. Lee and Kellerman collaborated together to create a completely modernized library.

“The architectural vision was to push the library to the corner of the building to gain access to natural light and views to the campus quadrangle,” Lee explained. “The relocation resulted in spaces of multiple heights that were more appropriate to the different library functions.”

By moving the library to a corner of the building, it now has ample daylight coming from windows which has dramatically changed the space.

By moving the library to a corner of the building, it now has ample daylight coming from windows which has dramatically changed the space. The design team added a new mezzanine level with a spiral staircase which doubles as a gallery space to display the school’s 125-year-old journalism archives and rare books collections. 

“It’s a very appealing setting, and one that the kids have responded to positively,” teacher/librarian Sima Thomas said. “That aspect, plus the spatial qualities of the space, including the staircase and the mezzanine. Many kids told us that this feels like a ‘real’ library.”

The design team added a new mezzanine level with a spiral staircase which doubles as a gallery space to display the school’s 125-year-old journalism archives and rare books collections.

Students used to cut through the library to get to the other side of the building. The design team created a pathway through the building to encourage flow and in doing so gave the library a proper entryway. The 25,600-square-foot building now houses the library with flexible instructional space, an adjacent gallery, college and career counseling and guidance services.

Students are able to enjoy silent and group study rooms, reading nooks and a large reading area with natural light and comfortable seating. Fiction and nonfiction books are able to be displayed in a more pleasing and accessible way which has led to higher circulation rates.

Students are able to enjoy silent and group study rooms, reading nooks and a large reading area with natural light and comfortable seating.

“This project shows how much is possible through thoughtful, carefully design renovation,” Kellerman said. “The existing building was uninteresting — the design team transformed it completely. We have transecting walls, interesting volumes, and a dedicated entry that honors the library as the hub that it is. Tearing down is wasteful.”

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • Benson Polytechnic High School in Portland, OR

    Preserving Legacy, Designing for the Future

    As historic academic buildings age, institutions face a difficult decision: preserve and adapt or demolish and rebuild. How do we honor the legacy of these spaces while adapting them to meet the needs of modern learners?

Digital Edition