MaST II Community Charter School

EwingCole

Project of Distinction 2020 Education Design Showcase

MaST II Community Charter School

Project Information

Facility Use: Elementary, Middle, and High School
Project Type: New Construction
Category: Whole Building/ Campus Design
Location: Philadelphia, PA
District/Inst.: MaST Community Charter School
Chief Administrator: John Swoyer
Completion Date: Fall 2019
Gross Area: 59,000 sq. ft.
Area Per Student: 98 sq. ft.
Site Size: 19 acres
Current Enrollment: 600
Capacity: 600
Cost per Student: N/A
Cost per Sq. Ft.: $254
Total Cost: $15,000,000

MaST II Community Charter School

The site planning and building architecture are a fully integrated design response to several constraints and prompts. Major roadways, floodplains, and rights-of-way as well as budget and phasing considerations were all significant constraints. At the same time, the Tacony Bridge, Delaware River, and even the history of the site (the former Dodge Steel and Tacony Ironworks, where City Hall’s William Penn statue was cast) presented unique opportunities for design inspiration and place-making. Two distinct building masses accommodate phasing limitations and offer program separation between lower and upper schools, while a void cut through both phases, linked with an elevated bridge, provides primary pedestrian circulation, multistory atria with media and maker spaces, and scenic views of the Tacony Bridge. Athletic fields and recreation space step down towards the river, and at the river’s edge the Tacony community has direct access to the recreational Delaware River Trail.

MaST II Community Charter School

Upon entering the public lobby, visitors are greeted by a series of shared learning spaces interconnected via a staggered vertical atrium. The juxtaposition of conventional as well as experimental learning techniques with cutting-edge technology typifies the pedagogy of the school and is reflected in the configuration and design of various learning environments such as the Media Center. The third floor offers a dynamic array of collaborative spaces oriented about the atrium, with an Art Room, Music Room, and Maker Space supporting interdisciplinary project-based learning in an open format. Corridors are punctuated with wider collaboration nodes, organizing each grade level into a 4-classroom hub with high transparency and interactivity between spaces.

MaST II Community Charter School

SUSTAINABILITY
The site has historically been used by industry and manufacturing which resulted in environmental degradation. The new school project remediated the site, including the installation of soil in a “clean cap”, making it safe for public uses again.

MaST II Community Charter School

Energy initiatives include high efficiency LED lighting with automatic lighting controls and dimming; gas-fired, DX roof top units; a web-based HVAC DDC control system with individual room scheduling and occupied/unoccupied controls; and high efficiency, condensing style domestic water heaters.

MaST II Community Charter School

A bio-retention basin provides water quality treatment on site. Vegetation, planting soil medium, and outlet controls are designed to allow the basin to filter out suspended solids. The basin will contribute to better air quality, reduce urban heat island impacts, provide habitat for native wildlife, and act as a landscape amenity to enhance the site aesthetics.

MaST II Community Charter School

COMMUNITY
A diverse team collaborated with the construction manager as well as teachers, students, and administrators during the design process. Moreover, community groups in the Tacony neighborhood and City of Philadelphia provided critical input and support for the new school’s planning, design, and implementation. The complex process for zoning approval received full support from Philadelphia’s Civic Design Review, a committee for the City Planning Commission. A nature trail circumnavigates the recreational playing fields, giving an opportunity for outdoor learning exhibits focused on environmentalism and local ecology, while also providing accessible means of reaching sport and spectator areas. The extension of the DRCC waterfront multi-use trail is accessible to area residents via the former Magee right-of-way, promoting health and wellness and supporting a shared community asset. The proposed development provides a minimum 50-foot waterfront setback, which protects the Delaware River, helps to maintain public aquatic ecosystems and riparian habitats, and minimizes erosion along the riverbanks. The shoreline buffer provides food, shelter, and nesting areas for fish and wildlife.

MaST II Community Charter School

Architect(s):

EwingCole
ANDREW DONALDSON-EVANS
215-923-2020

MaST II Community Charter School

Featured

  • Average Annual Number of Tornadoes per State

    New Tornado Wind Load Design Criteria in IBC Offer Improvements to Life Safety

    For the first time in U.S. building code history, the 2024 International Building Code (IBC) includes tornado wind load design criteria, marking a significant advancement in life-safety provisions.

  • Lawrence Group Announces Expansion of Student Housing Studio

    Integrated planning and design firm Lawrence Group recently announced that it has hired Nick Naeger, AIA, as the new Associate Principal / Senior Project Manager at its headquarters in St. Louis, Mo., according to a news release.

  • Kimball Showroom Earns WELL Certified Platinum Distinction

    Commercial furnishings company Kimball International recently announced that its showroom in New York City has achieved WELL Certification at the Platinum level as dictated by the International WELL Building Institute, according to a news release. The certification demonstrates a continuing commitment to creating environments that promote health, well-being, and productivity.

  • North Dakota State University Completes Music School Renovation

    North Dakota State University in Fargo, N.D., recently announced that construction on the Challey School of Music has finished, according to a news release. The university partnered with Foss Architecture & Interiors for design and Kraus-Anderson for construction services, and construction began in July 2024.

Digital Edition