Hytera Debuts New PoC to DMR/Analog Gateway Solution

Two-way radio communications solutions provider Hytera US Inc. recently announced the launch of its newest product, Hytera HALO Bridge. The system offers a simple and reliable Radio over IP (RoIP) gateway from Hytera Push-to-Talk over Cellular (PoC) radios and a wide variety of other DMR and analog radio systems, according to a news release.

The solution was designed for organizations needing to add nationwide PoC communications to their existing analog or DMR standard compliant two-way radio systems, the news release said. HALO Bridge can connect Hytera PoC radios with other devices like analog radios, Tier II DMR Radio systems, DMR Tier III trunked systems, and Hytera XPT systems for group calls to allow the expansion of hybrid communication using existing technology.

The hardware can be installed in a data closet or radio equipment rack with minimal disruptions. The device comes with a PoC and DMR mobile radio, a chassis, power supply, and cable, according to the news release. It also offers functionality for a variety of flexible system interconnect configurations, connecting narrowband systems to broadband systems or between two remote DMR radio systems via a PoC Broadband connection.

“Hytera’s new HALO Bridge adds tremendous flexibility to our Push-to-Talk over Cellular and DMR product lines,” said Hytera America VP of Sales Tom Wineland. “The HALO Bridge delivers great value by facilitating the expansion of a hybrid communication system and also protecting previous investment.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part I

    We asked, you answered, and the results are in! Last year, we put out a call for submissions to collect our readership’s opinion on trends and predictions for K–12 and higher education facilities in 2026.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.