Gretna East High School

Project of Distinction, New Construction | 2025 Education Design Showcase

DLR Group

Project Information

Facility Use: High School Institution
Project Type: New Construction
Category: Whole Building / Campus Design
Location: Nebraska
District/Inst.: Gretna Public Schools
Chief Administrator: Travis Lightle
Completion Date: 8/1/2023
Gross Area: 371,000 square feet
Area Per Student: 232 square feet
Site Size: 58.4 acres
Current Enrollment: 1,018
Capacity: 1,600
Cost per Student: $86,625
Cost per Sq. Ft.: $369.27
Total Cost: $137,000,000

Gretna East High School is all about connections—from land to sky, interior to exterior, and most critically, people to people. The integrated design team engaged the school board, administration, teachers, and students to ensure each aspect of the facility enriches learning. CTE programming is highlighted with spaces for computer programming, e-gaming, a welding shop, small engines, woods lab, and white box lab, which includes drone studies and a makerspace.

The 371,000 SF school serves 1,600 students in the Gretna community. Intentional linear movements off the central spine of the building create a connected learning environment of classrooms, breakout spaces, and outdoor learning areas. The glazing, carved into the monolithic walls of the exterior, creates both sunken and extruded reliefs that establish a bold rhythm along the façade. The building layout uses exterior views as a form of wayfinding, drawing occupants through the building and inspiring moments of reflection looking at the surrounding natural landscape.

In addition to the high school facility, the campus site includes soccer, softball, and baseball competition fields, a practice football field, and track and field facilities. A 2,000-seat, top-loading gym includes a running track around the main court and an auxiliary gym space that is also top-loaded and seats 500. The learning commons open to a large, 22,390 SF courtyard greenspace. The courtyard offers a variety of gathering spaces for students and staff, including individual, multiple classrooms, and small breakout spaces.

The Gretna School District Design Committee toured high schools in South Dakota, Kansas, Missouri, and Nebraska to help inform programming and design. These in-person tours also played a significant role in the group's definition of guiding principles for the school. The committee worked with designers to generate concepts for the site and building. During the schematic design process, the team received feedback from four small groups of school district professionals, which included administrators, teachers, staff, and community members.

Architect(s):

DLR Group
402-393-4100

Featured

  • Carnegie Mellon University Receives $3B Gift to Launch New Campus

    Carnegie Mellon University in Pittsburgh, Penn., recently announced that it has received $3 billion—the largest individual gift in higher education history—from Citadel CEO and founder Ken Griffin, according to a news release.

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.

  • UPenn Announces Completion of New Veterinary Education Facility

    The University of Pennsylvania in Philadelphia, Penn., recently finished construction on an 11,800-square-foot veterinary education building, according to a news release. The Gail P. Riepe Center for Advanced Veterinary Education is the first dedicated classroom facility at the New Bolton Center, a large-animal hospital and campus about 35 miles west of the campus proper.