Gretna East High School

Project of Distinction, New Construction | 2025 Education Design Showcase

DLR Group

Project Information

Facility Use: High School Institution
Project Type: New Construction
Category: Whole Building / Campus Design
Location: Nebraska
District/Inst.: Gretna Public Schools
Chief Administrator: Travis Lightle
Completion Date: 8/1/2023
Gross Area: 371,000 square feet
Area Per Student: 232 square feet
Site Size: 58.4 acres
Current Enrollment: 1,018
Capacity: 1,600
Cost per Student: $86,625
Cost per Sq. Ft.: $369.27
Total Cost: $137,000,000

Gretna East High School is all about connections—from land to sky, interior to exterior, and most critically, people to people. The integrated design team engaged the school board, administration, teachers, and students to ensure each aspect of the facility enriches learning. CTE programming is highlighted with spaces for computer programming, e-gaming, a welding shop, small engines, woods lab, and white box lab, which includes drone studies and a makerspace.

The 371,000 SF school serves 1,600 students in the Gretna community. Intentional linear movements off the central spine of the building create a connected learning environment of classrooms, breakout spaces, and outdoor learning areas. The glazing, carved into the monolithic walls of the exterior, creates both sunken and extruded reliefs that establish a bold rhythm along the façade. The building layout uses exterior views as a form of wayfinding, drawing occupants through the building and inspiring moments of reflection looking at the surrounding natural landscape.

In addition to the high school facility, the campus site includes soccer, softball, and baseball competition fields, a practice football field, and track and field facilities. A 2,000-seat, top-loading gym includes a running track around the main court and an auxiliary gym space that is also top-loaded and seats 500. The learning commons open to a large, 22,390 SF courtyard greenspace. The courtyard offers a variety of gathering spaces for students and staff, including individual, multiple classrooms, and small breakout spaces.

The Gretna School District Design Committee toured high schools in South Dakota, Kansas, Missouri, and Nebraska to help inform programming and design. These in-person tours also played a significant role in the group's definition of guiding principles for the school. The committee worked with designers to generate concepts for the site and building. During the schematic design process, the team received feedback from four small groups of school district professionals, which included administrators, teachers, staff, and community members.

Architect(s):

DLR Group
402-393-4100

Featured

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • UT-San Antonio Begins Residence Hall Renovations

    The University of Texas at San Antonio recently began a $6-million renovation project to one of its residence halls, according to a news release. Originally completed in 1986, Chisolm Hall measures in at 120,860 square feet and is the oldest and largest residence hall on campus.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.