PreK-12 Education


Articles

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • Kraus-Anderson Completes Improvements at Minnesota Middle, High Schools

    Construction management, real estate, and risk management firm Kraus-Anderson recently announced that it has finished two K–12 renovation projects in Minnesota, according to a news release.

  • California High School Starts Construction on STEAM, Music Buildings

    Tamalpais High School, part of the Tamalpais Union High School District, recently broke ground on two new major facilities for its campus in Mill Valley, Calif., according to a news release. The district is partnering with Quattrocchi Kwok Architects (QKA) and Lathrop Construction Associates for the Science Technology, Engineering, Arts, and Mathematics (STEAM) and Music Buildings, both replacing their outdated counterparts.


Podcasts

  • Furnishing the Future: Adaptive Solutions for Modern Learning Spaces

    On this episode of Schools in Focus, we'll talk about the role that classroom furniture plays in creating adaptive, flexible learning spaces. Our guest is Wesley Edmonds, the Director of Workplace, Adaptive Solutions at OFS.

  • Being Transparent About School Safety Design

    This episode's guest is Devin Bowman, General Manager of Technical Glass Products (TGP) and AD Systems. We’ll talk about the relationship between school architecture and designing for safety as design aspects like natural light and floor-to-ceiling windows become more common.

  • PCM and Energy Savings in Schools

    This episode’s guest is Michael Dunn, Technical Sales Manager for Energy Saving Ceilings & PCM at Armstrong World Industries. He’s here to talk about how Phase Change Material (PCM) can help provide energy savings in schools. You’ll learn why many K¬–12 schools are on the hunt for a new HVAC solution and the practical applications of PCM ceiling panels in regulating temperature without driving up energy costs. He’ll also share the results of the case study at a New Hampshire high school that demonstrated the technology’s effectiveness. This episode is sponsored by Armstrong World Industries.


Webcasts


Whitepapers

  • A Classroom is Many Spaces...All for Learning

    Gain practical insights into effective classroom design for early learning. Equip yourself with the knowledge to create a classroom that’s not just a space, but a spectrum of learning opportunities.

  • School District Builds Trust with Students While Increasing Safety

    Find out how Champaign Unit 4 School District was able to build trust with students while increasing safety by leveraging Evolv Express® System.

  • Classroom Design: Where Aesthetics and Affordability Connect.

    Virtual reality (VR) is going to school, as a collaborative, creative component in design for early childhood and K-12 classrooms. Giving educators and designers the ability to see how desks, seating, storage, and other accessories work together ensures that classrooms can successfully accommodate a range of learning activities and needs.


Digital Edition