New DREAMS Program Introduced at Waipahu Intermediate School Campus

(DLR Group) June 2, 2014 ― DLR Group is partnering with the Hawaii Department of Education and Waipahu Intermediate School to design a facility to house the school’s new DREAMS program. DREAMS – Digital media, Robotics, Engineering/electronics, Animation, Music and Science - responds to Waipahu’s vision to provide 21st Century learning opportunities in a collaborative, student-led environment. Located in Waipahu on Oahu, the new facility will be part of the Waipahu Intermediate Campus, which currently serves 1,200 students in grades seven and eight.

DLR Group’s design will provide 30,000 SF of specialized learning spaces, including classrooms, instructional labs and flexible spaces for small or large group study. Partnerships are essential to the success of the DREAMS program. Currently, Waipahu Intermediate School has secured a joint partnership with ‘Olelo Community Media to contribute to the Digital Media curriculum.

“Waipahu Intermediate School’s DREAMS program is the epitome of 21st Century learning. DLR Group is thrilled to design the first facility of this type in Hawaii,” said DLR Group Principal Lisa Johnson, AIA. “Our design will feature abundant technology and a variety of flexible learning spaces that will allow students to follow their talents and passion.”

In addition to new learning spaces, DLR Group’s design will create a commons and faculty center to connect the campus and surrounding community. A new auditorium will allow the school to screen both student and community productions.

To achieve Waipahu’s sustainability goals and meet Hawaii CHPs criteria, a variety of sustainable energy approaches are being pursued, including natural daylighting, natural ventilation capability, photovoltaic panels for on-sire renewable energy production, and a high efficiency mechanical system.

Construction of the $10M facility is expected to begin in September 2015 and will be completed in summer of 2016.

About DLR Group
DLR Group is an interdisciplinary design firm providing architecture, engineering, planning, and interior design from offices coast-to-coast and in China. Our promise is to elevate the human experience through design. This promise inspires sustainable design for a diverse group of public and private sector clients; local communities; and our planet. DLR Group fully supports the initiatives and goals of the 2030 Challenge and is an initial signatory to the AIA 2030 Commitment. Visit dlrgroup.com and follow us in Twitter.

Featured

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.

  • Rhode Island Boarding School Completes Student Dorm Renovations

    St. George’s School in Middletown, R.I., recently announced the completion of a $26-million renovation project on Arden-Diman-Eccles Dormitory, according to a news release. The school partnered with Voith & Mactavish Architects (VMA) on the new space, which places a new focus on collaborative community spaces open to both boarding students and day students.

  • Construction Begins on New University Research Vessel

    Boat-building company All American Marine recently announced that it has begun construction on a new catamaran research vessel for the University of Texas Marine Science Institute (UTMSI) in Port Aransas, Texas, according to a news release.

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.