University of Houston Building Wins 2014 PCI Design Award

CHICAGO — The University of Houston Health and Biomedical Sciences Building 1 was named “Best Higher Education Building” by The Precast/Prestressed Concrete Institute (PCI) in the Institute’s 2014 PCI Design Awards.

The award celebrates the distinctive beveled façade of the clinical, research, and teaching facility for this Carnegie Tier 1 research institution and the smart design thinking behind it. Catching the sun as it plays across the building’s surface, the undulating precast concrete façade system is an innovative, high-value design solution that responds to challenges dictated by topography, program, and budget.  

The design response uses simple rectangular concrete panels that are triangularly faceted, creating peaks and valleys in the façade’s surface. Shadow and light dance across the windowless expanses in a series of patterns that shift with the passing of time and seasons.

Shepley Bulfinch of Boston was the design architect for the project, in association with Bailey Architects of Houston. They two firms are now partnering on the University of Houston’s Health and Biomedical Sciences Building 2 project, which is scheduled to break ground in 2015.

Now in their 52nd year, the PCI Design Awards recognize excellence in the design, fabrication, and construction of precast structures and systems.

Featured

  • Texas A&M Opens First Building at Fort Worth Campus, Breaks Ground on Research Facility

    The Texas A&M University System marked a major milestone in the development of its Fort Worth campus by opening its first completed academic building and breaking ground on a second facility designed to expand research and industry collaboration.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • Fellowes Expands Finish and Wall-Covering Options for Architectural Wall Systems

    Fellowes Architectural Solutions has expanded the materials library for its architectural wall systems with a series of new finishes and wall-covering options intended to provide architects and designers with additional choices for commercial interiors, according to a company news release.