University of Houston Building Wins 2014 PCI Design Award

CHICAGO — The University of Houston Health and Biomedical Sciences Building 1 was named “Best Higher Education Building” by The Precast/Prestressed Concrete Institute (PCI) in the Institute’s 2014 PCI Design Awards.

The award celebrates the distinctive beveled façade of the clinical, research, and teaching facility for this Carnegie Tier 1 research institution and the smart design thinking behind it. Catching the sun as it plays across the building’s surface, the undulating precast concrete façade system is an innovative, high-value design solution that responds to challenges dictated by topography, program, and budget.  

The design response uses simple rectangular concrete panels that are triangularly faceted, creating peaks and valleys in the façade’s surface. Shadow and light dance across the windowless expanses in a series of patterns that shift with the passing of time and seasons.

Shepley Bulfinch of Boston was the design architect for the project, in association with Bailey Architects of Houston. They two firms are now partnering on the University of Houston’s Health and Biomedical Sciences Building 2 project, which is scheduled to break ground in 2015.

Now in their 52nd year, the PCI Design Awards recognize excellence in the design, fabrication, and construction of precast structures and systems.

Featured

  • Girl Sitting at Library Desk, Using Laptop

    How Campus Design Shapes the Finals Week Experience

    Academic performance is not just about preparation. It is closely tied to how students manage stress, maintain their energy, and shift between work and recovery modes. Much of that is influenced, directly or indirectly, by design.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Armstrong World Industries Acquires Parallel Architectural Products

    Armstrong World Industries, provider of interior and exterior architectural applications, recently announced that it has acquired the Colorado-based Parallel Architectural Products, according to a news release.