The Boston Conservatory: Studio Building

The Boston Conservatory: Studio Building

PHOTOS © TOM KESSLER PHOTOGRAPHY LLC

The Boston Conservatory, the oldest performing arts conservatory of its kind in the nation, opened its new Studio Building in September 2014. Designed by Handel Architects LLP and Utile, the building houses a large orchestra rehearsal space, dance studios, teaching studios, multipurpose rooms and practice rooms for the instruction of movement, theater, voice, instrument and orchestra ensemble.

The 20,000-square-foot studio building was designed to leverage the 150-year-old institution’s presence in Boston while creating a state-of-the-art learning environment for students and faculty. A brick and curtain-wall façade echoes the character of the historically significant neighborhood. Interaction between students and faculty is promoted by a common entry into a dramatic three-story atrium stairwell, punctuated by student lounges at each landing. Two 1,500-square-foot dance studios take primary position at the top of the building, with stunning views and natural light.

Located at the edge of the Massachusetts Turnpike and a commuter rail line, and with Fenway Park just down the street, the site was selected for its high visibility to the neighborhood. But this virtue has the drawback of frequently loud ambient noise, which in turn required a design that minimized windows into the rehearsal studios. To create effective noise-isolation, “box within a box” construction leverages the density of the brick walls while also creating a visually cohesive fit in the neighborhood.

The team’s design solution was inspired by both the vitality and challenges of a site located in the heart of a major U.S. city, successfully blending with the urban fabric while creating an architectural presence representative of the values of The Boston Conservatory.

This article originally appeared in the issue of .

Featured

  • Lewis C. Cassidy Elementary School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Lewis C. Cassidy Elementary School has been recognized with an EDS 2025 Grand Prize award in the category of New Construction.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Allegion US Partners with Two Colleges for Mobile Credential Technology

    Allegion US recently announced a partnership with Florida Institute of Technology (FIT) and Denison College, in conjunction with Transact + CBORD, to install mobile credential technologies campus-wide, according to a news release. Implementing Mobile Student ID into Apple Wallet and Google Wallet will allow students access to campus facilities, amenities, and residence halls using just their phones.

  • ECM Technologies Wins ‘Most Innovative Business of the Year’ Award

    HVAC preventative maintenance and efficiency solutions provider ECM Technologies was recently named the “Most Innovative Business of the Year” at the 2025 Champions of Change Awards, according to a news release. The program recognizes Arizona business leaders and organizations taking steps to make a positive impact on the state through innovative thinking and philanthropy.

Digital Edition