AAMA Releases Updated Sound Control Document

Schaumburg, Ill. — The American Architectural Manufacturers Association (AAMA) has updated a document specific to sound control for fenestration products. AAMA TIR-A1 provides detailed technical information for the reduction of sound transmission through building envelopes in terms of the design and construction of both commercial and residential buildings. Some new definitions were added to this document, which was last updated in 2004.

Newly-defined terms include “Apparent Outdoor-Indoor Transmission Class” and “Outdoor-Indoor Transmission Class,” as well as “Sound Transmission Class.” The document was prepared for those who require information on how sound is transmitted and measured, and how its transmission can be controlled. It is intended to serve as a guide for anyone from window designers working with architects to sales teams trying to meet customers’ needs regarding sound control.

One of the significant updates to the document is the clarification and differentiation between the two methods of fenestration product classification: Sound Transmission Class (STC) and Outdoor-Indoor Transmission Class (OITC), as well as the clear definition of their appropriate application.

“The document provides a helpful resource for fenestration designers, architects and consultants who want to enhance their understanding of sound control related to windows and doors,” says Scott Warner (Architectural Testing), Chair of the AAMA Methods of Test Committee. “This highly technical topic is presented in laymen’s terms such that building owners and sales staff will be able to understand and describe the important differences between OITC and STC as well as interior and transportation noise abatement.”

AAMA TIR-A1, along with other AAMA documents, is available from AAMA’s Publication Store. - www.aamanet.org

Featured

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • A university

    Breaking Higher Education's Billion-Dollar Backlog Problem

    Strategic mechanical system design can transform campus maintenance backlogs. Here's how.

  • North Dakota State University Completes Music School Renovation

    North Dakota State University in Fargo, N.D., recently announced that construction on the Challey School of Music has finished, according to a news release. The university partnered with Foss Architecture & Interiors for design and Kraus-Anderson for construction services, and construction began in July 2024.

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

Digital Edition