School districts in the United States spent more than $14 billion ($14,123,865,000) on construction projects completed during the 2014 calendar year. Almost $7.8 billion of that was spent on new schools, accounting for 55 percent of the construction dollars.

The balance was split between additions to existing buildings (accounting for $3.2 billion) and the retrofitting and modernization of existing structures that accounted for $3.14 billion. The difference of spending for new buildings and existing ones was very close to the pattern of the previous year.

Looked at in terms of on-going educational construction, school districts in the United States appear to be involved in almost $40 billion worth of construction activity right now, and that is probably a low-ball estimate.

In 2014, the median elementary school in the United States cost $211.55 per square foot to build. Median spending was $43,693 per pupil and the median elementary school provided 188 square feet for each student. The median elementary school reported was designed for 624 students and encompasses 84,700 square feet at a total cost of $16,269,543.

The median cost of a middle school is $242.96 per square foot. Median spending per pupil was $43,635 and the median middle school provides 173.4 square feet per student. The median number of students in middle schools built in 2014 is 612 and the building size is 118,500 square feet. The cost is $26.5 million.

The median high school cost $45 million and provided 173,727 square feet. It was designed to accommodate 1,000 students. The median high school provides 180 square feet per student at $49,000 for each student. The cost per square foot was $235.29.

Source: School Planning & Management’s 20th Annual School Construction Report

This article originally appeared in the issue of .

Featured

  • Pitzer College

    Designing for Change in Higher Ed Learning Environments

    Higher education will continue to evolve, and learning environments must evolve with it. By prioritizing adaptable infrastructure, thoughtful reuse, strong energy performance, and wellness-centered design, campuses can create spaces that support learning today while remaining flexible for the future.

  • University of Kansas Breaks Ground on Entrepreneurship Hub

    The University of Kansas in Lawrence, Kan., recently held a groundbreaking ceremony for the new KU Entrepreneurship Hub, according to university news. The Hub is part of the university’s School of Business and will include spaces for experiential learning and programming.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • South Carolina District Starts Construction on $50M Middle School Renovation

    The Aiken County Public School District in North Augusta, S.C., recently held a groundbreaking ceremony for the $50-million renovation and expansion of North Augusta Middle School, according to a news release. The project’s funding comes from the 2024 renewal of a one-cent sales tax approved by local voters.