School Costs: Did You Know...

School districts in the United States spent more than $14 billion ($14,123,865,000) on construction projects completed during the 2014 calendar year. Almost $7.8 billion of that was spent on new schools, accounting for 55 percent of the construction dollars.

The balance was split between additions to existing buildings (accounting for $3.2 billion) and the retrofitting and modernization of existing structures that accounted for $3.14 billion. The difference of spending for new buildings and existing ones was very close to the pattern of the previous year.

Looked at in terms of on-going educational construction, school districts in the United States appear to be involved in almost $40 billion worth of construction activity right now, and that is probably a low-ball estimate.

In 2014, the median elementary school in the United States cost $211.55 per square foot to build. Median spending was $43,693 per pupil and the median elementary school provided 188 square feet for each student. The median elementary school reported was designed for 624 students and encompasses 84,700 square feet at a total cost of $16,269,543.

The median cost of a middle school is $242.96 per square foot. Median spending per pupil was $43,635 and the median middle school provides 173.4 square feet per student. The median number of students in middle schools built in 2014 is 612 and the building size is 118,500 square feet. The cost is $26.5 million.

The median high school cost $45 million and provided 173,727 square feet. It was designed to accommodate 1,000 students. The median high school provides 180 square feet per student at $49,000 for each student. The cost per square foot was $235.29.

Source: School Planning & Management’s 20th Annual School Construction Report

This article originally appeared in the issue of .

Featured

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

  • illustration of a school building under construction

    One District, One Way: Bringing Consistency to K–12 Construction Projects

    From budgeting to closeout, here's how a single playbook can turn chaos into clarity in school construction programs.

  • North Dakota State University Completes Music School Renovation

    North Dakota State University in Fargo, N.D., recently announced that construction on the Challey School of Music has finished, according to a news release. The university partnered with Foss Architecture & Interiors for design and Kraus-Anderson for construction services, and construction began in July 2024.

Digital Edition