School districts in the United States spent more than $14 billion ($14,123,865,000) on construction projects completed during the 2014 calendar year. Almost $7.8 billion of that was spent on new schools, accounting for 55 percent of the construction dollars.

The balance was split between additions to existing buildings (accounting for $3.2 billion) and the retrofitting and modernization of existing structures that accounted for $3.14 billion. The difference of spending for new buildings and existing ones was very close to the pattern of the previous year.

Looked at in terms of on-going educational construction, school districts in the United States appear to be involved in almost $40 billion worth of construction activity right now, and that is probably a low-ball estimate.

In 2014, the median elementary school in the United States cost $211.55 per square foot to build. Median spending was $43,693 per pupil and the median elementary school provided 188 square feet for each student. The median elementary school reported was designed for 624 students and encompasses 84,700 square feet at a total cost of $16,269,543.

The median cost of a middle school is $242.96 per square foot. Median spending per pupil was $43,635 and the median middle school provides 173.4 square feet per student. The median number of students in middle schools built in 2014 is 612 and the building size is 118,500 square feet. The cost is $26.5 million.

The median high school cost $45 million and provided 173,727 square feet. It was designed to accommodate 1,000 students. The median high school provides 180 square feet per student at $49,000 for each student. The cost per square foot was $235.29.

Source: School Planning & Management’s 20th Annual School Construction Report

This article originally appeared in the issue of .

Featured

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.

  • NWEA Report Recommends K–12 Natural Disaster Recovery Strategies

    The Northwest Evaluation Association (NWEA), a K–12 assessment and research organization, recently announced the release of a new playbook for schools and communities recovering from extreme weather events, according to a news release.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part II

    As education leaders look toward 2026, the design of K–12 and higher education facilities is being reshaped by powerful, converging forces. Survey respondents point to the rapid growth of Career and Technical Education, deeper alignment with workforce and industry needs, and the accelerating influence of AI and emerging technologies.