Cleaner Air Means Happier, Healthier Students

Cleaner Air

Cleaner air means students will be healthier, and absent less, as was the case at Community Consolidated School District 181.

Nothing gets A principal’s attention quite like a parent or teacher concern. If it’s a health-related issue tied to air quality, the facility manager is also in the hot seat.

That’s where Mike Vilendrer, facility coordinator at Community Consolidated School District 181, found himself after a teacher and a parent voiced concern about air quality situations in separate classrooms.

Vilendrer’s IAQ to-do list included:

  • Science lab: A student with sensitive allergies had persistent health problems because of suspected air quality issues in a science room. The child’s parent asked that a HEPA filter purification system be installed.
  • Art room: Art supplies were sending lots of dust and other particles into the air, creating an uncomfortable and unhealthy environment.
  • Classroom: A teacher reached out to the principal about consistent problems with the air quality in her classroom.

Vilendrer quickly realized that the HVAC system for the 108,000-square-foot school was not equipped to handle the air quality problems he faced.

He installed four AeraMax Professional commercial-grade air purifiers — three for the main problem locations and one in the band room.

Another reason Vilendrer decided to take a targeted approach. The unit is designed to turn on and off on its own and remain quiet in public buildings.

“As far as the operational side, they’re quiet as can be and don’t impact teaching at all,” Vilendrer says.

Eight months after installing the units the difference was clear. “The issues we were having completely went away,” he notes.

More remarkably, the art teacher told Vilendrer that there had been a noticeable drop in absences compared with past school years.

www.aeramaxpro.com

This article originally appeared in the issue of .

Featured

  • Image courtesy of Kahler Slater

    UW–Madison Announces Completion of Morgridge Hall

    The University of Wisconsin–Madison recently announced that construction is complete on Morgridge Hall, a new academic building, according to a news release. The facility opened September 3 at the start of the fall semester, consolidating the School of Computer, Data & Information Sciences into a single facility for the first time.

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Pitzer College

    Designing for Change in Higher Ed Learning Environments

    Higher education will continue to evolve, and learning environments must evolve with it. By prioritizing adaptable infrastructure, thoughtful reuse, strong energy performance, and wellness-centered design, campuses can create spaces that support learning today while remaining flexible for the future.