Cleaner Air Means Happier, Healthier Students

Cleaner Air

Cleaner air means students will be healthier, and absent less, as was the case at Community Consolidated School District 181.

Nothing gets A principal’s attention quite like a parent or teacher concern. If it’s a health-related issue tied to air quality, the facility manager is also in the hot seat.

That’s where Mike Vilendrer, facility coordinator at Community Consolidated School District 181, found himself after a teacher and a parent voiced concern about air quality situations in separate classrooms.

Vilendrer’s IAQ to-do list included:

  • Science lab: A student with sensitive allergies had persistent health problems because of suspected air quality issues in a science room. The child’s parent asked that a HEPA filter purification system be installed.
  • Art room: Art supplies were sending lots of dust and other particles into the air, creating an uncomfortable and unhealthy environment.
  • Classroom: A teacher reached out to the principal about consistent problems with the air quality in her classroom.

Vilendrer quickly realized that the HVAC system for the 108,000-square-foot school was not equipped to handle the air quality problems he faced.

He installed four AeraMax Professional commercial-grade air purifiers — three for the main problem locations and one in the band room.

Another reason Vilendrer decided to take a targeted approach. The unit is designed to turn on and off on its own and remain quiet in public buildings.

“As far as the operational side, they’re quiet as can be and don’t impact teaching at all,” Vilendrer says.

Eight months after installing the units the difference was clear. “The issues we were having completely went away,” he notes.

More remarkably, the art teacher told Vilendrer that there had been a noticeable drop in absences compared with past school years.

www.aeramaxpro.com

This article originally appeared in the issue of .

Featured

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • North Texas School District Completes Third New Elementary School

    The Denton Independent School District in Dallas, Texas, recently finished construction on its third prototype design elementary school, Reeves Elementary, according to a news release.

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

Digital Edition