Cleaner Air Means Happier, Healthier Students

Cleaner Air

Cleaner air means students will be healthier, and absent less, as was the case at Community Consolidated School District 181.

Nothing gets A principal’s attention quite like a parent or teacher concern. If it’s a health-related issue tied to air quality, the facility manager is also in the hot seat.

That’s where Mike Vilendrer, facility coordinator at Community Consolidated School District 181, found himself after a teacher and a parent voiced concern about air quality situations in separate classrooms.

Vilendrer’s IAQ to-do list included:

  • Science lab: A student with sensitive allergies had persistent health problems because of suspected air quality issues in a science room. The child’s parent asked that a HEPA filter purification system be installed.
  • Art room: Art supplies were sending lots of dust and other particles into the air, creating an uncomfortable and unhealthy environment.
  • Classroom: A teacher reached out to the principal about consistent problems with the air quality in her classroom.

Vilendrer quickly realized that the HVAC system for the 108,000-square-foot school was not equipped to handle the air quality problems he faced.

He installed four AeraMax Professional commercial-grade air purifiers — three for the main problem locations and one in the band room.

Another reason Vilendrer decided to take a targeted approach. The unit is designed to turn on and off on its own and remain quiet in public buildings.

“As far as the operational side, they’re quiet as can be and don’t impact teaching at all,” Vilendrer says.

Eight months after installing the units the difference was clear. “The issues we were having completely went away,” he notes.

More remarkably, the art teacher told Vilendrer that there had been a noticeable drop in absences compared with past school years.

www.aeramaxpro.com

This article originally appeared in the issue of .

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.