UNCC Taps Woolpert for $14.5M Academic Complex Renovation

CHARLOTTE, NC – The University of North Carolina Charlotte has contracted with Woolpert to renovate the five campus buildings that make up the school’s Academic Complex.

The $14.5 million budgeted for construction will provide for upgrades to the facilities' mechanical, electrical and plumbing, and the installation of a fire protection system. In addition to accessibility upgrades, the project will provide new interior finishes and exterior windows, and will address minor building settlement.

Project Manager David Welling works from Woolpert’s Charlotte office.

“Being a UNCC grad and having attended classes in these buildings, I’m very excited to be part of the team for this important project,” Welling says. “Recently, the trend has been to renovate the state’s capital infrastructure. The end result of this project will provide a more comfortable learning environment for the students.”

Woolpert is an architecture, engineering and geospatial firm focusing on higher education projects. With offices in the Carolinas and throughout the U.S., the Dayton, OH-based company has ongoing university projects with the University of North Carolina Charlotte, The Citadel, Miami University, the West Virginia School of Osteopathic Medicine, Georgia Southern University, Norfolk State University and Tuskegee University, among others. For more information, visit woolpert.com or call 937/531-1258.

Featured

  • Myrtle Grove Elementary

    Phased Construction Keeps Students on Campus During Rebuild

    When Escambia County School District needed to replace most of Myrtle Grove Elementary School in Pensacola, Fla., it had three distinct challenges: honor the school's legacy in the community, bring state-of-the-art learning environments to the county, and be seamlessly built on the same site as the active school campus.

  • abstract illustration of school gym

    How the Gymnasium Can Serve as a Model for Learning Space Design

    Multipurpose gyms work because flexibility was built into the brief from the start, not retrofitted later. The same logic applies to academic spaces.

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • GeoCam and UCLA: Modernizing Campus Accessibility Mapping

    In early 2025, UCLA partnered with GeoCam to capture and modernize its pedestrian infrastructure data. The goal was ambitious but clear: to produce a high-accuracy, imagery-backed digital map of every sidewalk, pathway, ramp, and ADA-related feature on UCLA’s 419-acre campus.