EPA Awards Green Infrastructure Grant of $20,000 to Kansas State University

LENEXA, KS – The U.S. Environmental Protection Agency has awarded a $20,000 grant to Kansas State University to carry out a green infrastructure demonstration and training project on its campus in Manhattan, KS.

Faculty and students will create “living laboratories” to conduct green infrastructure monitoring at two on-campus sites — the rain garden at the International Student Center and the meadow at the Marianna Kistler Beach Museum of Art.

According to the project narrative, faculty will devise a “green infrastructure monitoring curriculum” that will offer “technical training on water quality analysis, runoff modeling, and overall ecological health assessments.” Students from different disciplines will collaborate on the monitoring program. They will record and analyze data to gauge performance, then develop communication materials, including brochures and a touch screen at the museum.

“Measuring green infrastructure’s impact is important, and so is training individuals who can make contributions to the field,” says Ken Kopocis, EPA’s deputy assistant administrator for Water. “By giving students hands-on experience with green infrastructure monitoring, this project achieves both objectives.”

Green infrastructure uses vegetation, soils and natural processes to manage wet weather runoff, treating stormwater as a resource rather than a waste. It can enhance resiliency for communities and landscapes faced with water pollution and climate change impacts by increasing water supplies, reducing flooding, combatting urban heat island effect and improving water quality.

The award encourages sustainable stormwater management by educating the next generation of scientists, designers and engineers about green infrastructure. By supporting demonstrations and training, colleges and universities can advance the implementation of green infrastructure to protect water quality.

This award builds on the success of EPA’s Campus RainWorks Challenge, in which faculty and student teams design green infrastructure projects for their campuses. Kansas State won a $2,000 first-place prize in 2013.

EPA also awarded a $20,000 grant to Mississippi State University to design and construct a 1,500-square-foot rain garden to manage runoff from a nearby building.

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • St. John Fisher University

    Classroom Revitalization – Basil Hall Room 216

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. St. John Fisher University's Basil Hall Room 216 Classroom Revitalization has been recognized with an EDS 2026 Project of Distinction award in the category of Spaces.

  • St. Lucie County, Fla., Breaks Ground on New K–8 School

    St. Lucie Public Schools in St. Lucie County, Fla., recently held a groundbreaking ceremony for a new K–8 school, according to a news release. The district partnered with Spiezle Architectural Group, Inc., for the design of the upcoming Ft. Pierce K–8 School, which comprises six buildings covering 215,000 square feet.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.