EPA Awards Green Infrastructure Grant of $20,000 to Kansas State University

LENEXA, KS – The U.S. Environmental Protection Agency has awarded a $20,000 grant to Kansas State University to carry out a green infrastructure demonstration and training project on its campus in Manhattan, KS.

Faculty and students will create “living laboratories” to conduct green infrastructure monitoring at two on-campus sites — the rain garden at the International Student Center and the meadow at the Marianna Kistler Beach Museum of Art.

According to the project narrative, faculty will devise a “green infrastructure monitoring curriculum” that will offer “technical training on water quality analysis, runoff modeling, and overall ecological health assessments.” Students from different disciplines will collaborate on the monitoring program. They will record and analyze data to gauge performance, then develop communication materials, including brochures and a touch screen at the museum.

“Measuring green infrastructure’s impact is important, and so is training individuals who can make contributions to the field,” says Ken Kopocis, EPA’s deputy assistant administrator for Water. “By giving students hands-on experience with green infrastructure monitoring, this project achieves both objectives.”

Green infrastructure uses vegetation, soils and natural processes to manage wet weather runoff, treating stormwater as a resource rather than a waste. It can enhance resiliency for communities and landscapes faced with water pollution and climate change impacts by increasing water supplies, reducing flooding, combatting urban heat island effect and improving water quality.

The award encourages sustainable stormwater management by educating the next generation of scientists, designers and engineers about green infrastructure. By supporting demonstrations and training, colleges and universities can advance the implementation of green infrastructure to protect water quality.

This award builds on the success of EPA’s Campus RainWorks Challenge, in which faculty and student teams design green infrastructure projects for their campuses. Kansas State won a $2,000 first-place prize in 2013.

EPA also awarded a $20,000 grant to Mississippi State University to design and construct a 1,500-square-foot rain garden to manage runoff from a nearby building.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.