Acoustic Panels Reduce Noise and Boost Productivity

Adelphi University Acoustic Panels

Acoustic Lay-in Panels from Eckel Noise Control Technologies helped Adelphi University give its students a quiet space for study that supports both individual and collaborative efforts.

On higher education campuses and in other academic settings, the library is a destination for group study and project collaboration. These endeavors require students to interact verbally. But when the environment isn’t acoustically designed for that purpose, things get noisy, and both those in groups and those doing individual study suffer.

This is exactly the situation that Long Island’s Adelphi University found itself in about five years ago. Ceiling tiles in the collaborative study area on the first floor of the Swirbul Library were old and had been painted several times over. This destroyed any absorptive qualities the tiles once had and actually made them reflect and reverberate sound.

“The collaborative study area was very loud, so much so that students had to raise their voices as if they were outside,” says Jerry Tangredi, Adelphi’s associate director for Facilities Planning, Construction and Design.

Tangredi reached out to an acoustics consultant he had known and worked with for several years. Sy Lerner, vice president at Controlled Acoustics Corporation, visited the library to assess the situation. He proposed installing Acoustic Lay-in Panels (ALPs) from Eckel Noise Control Technologies of Cambridge, MA.

For the initial Adelphi project, Eckel manufactured 20 custom-sized ALPs to accommodate the existing drop-ceiling grid in the collaborative study area. In the months following the installation, both staff and students noted a marked improvement.

“We now have ALPs in all areas of the library where students work together,” Tangredi says. “Our students and staff are very pleased with the outcome. It’s gratifying to have found a solution that enables effective collaborative work without the risk of creating a disturbance that impedes anyone else’s studies.”

With a total of more than 2,400 Eckel ALPs installed in the library, Adelphi students now enjoy the benefits of a quiet space for both collaborative and individual research and study.

www.eckelusa.com

This article originally appeared in the issue of .

Featured

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.

  • Colorado School District Breaks Ground on Unified PK–12 Campus

    The Haxtun School District No. Re-2J in Haxtun, Colo., recently announced that ground has been broken on a renovation/addition project that will unite its two schools, Haxtun Elementary and Haxtun Jr/Sr High School, according to a news release.

  • Q&A: How to Prevent Kitchen Grease Fires in Commercial Kitchens

    School cafeterias and university dining halls serve thousands of meals daily, relying on high-heat equipment like fryers, grills, and ovens. While these operations keep students fed, they also generate significant grease-laden vapors. Without proper controls, this grease becomes a silent fire threat. As a certified exhaust cleaning specialist and business coach who has helped hundreds of institutional facilities achieve NFPA 96 compliance, I emphasize that proactive grease management isn’t optional; it’s a core fire/life safety practice.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.