Drexel University: Dana and David Dornsife Center for Neighborhood Partnerships

Drexel University: Dana and David Dornsife Center for Neighborhood Partnerships

PHOTOS © BLT ARCHITECTS

The Dana and David Dornsife Center for Neighborhood Partnerships responds to Drexel University’s framework for civic engagement by providing new spaces that support the three dimensions of civic engagement. The current site of the Dornsife Center is home to three existing buildings — an 1867 Italianette mansion, an 1867 carriage works and a 1958 school building — that had sat dormant for a number of years.

The creation of the Center, with architectural and interior design services provided by BLT Architects of Philadelphia, involved the adaptive reuse of the three structures into a new university outpost providing community support services to the surrounding neighborhoods.

After the site and the primary donors for the renovation were identified, a stakeholder planning process was launched as a way to integrate the new Center into the priorities of the surrounding neighborhoods and the Drexel community. They used the Future Search planning framework; a consensus-building process that brings together participants from a range of perspectives who have some combination of authority, expertise and information relating to a particular issue. The workshops examine their past, present, and desired future to discover common ground and develop concrete action plans.

Initial facility programming and planning for the new uses involved careful analysis of each buildings limitations as well as opportunities to restore historic building fabric. Grouping common functions led to defining the buildings according to their best uses. The mansion, with its smaller rooms and more intact historic interiors, easily lent itself to office and conference room functions for the legal clinic and center administration.

The carriage house, which required significant gutting of later renovations, became the logical choice for the health, learning and gathering activities. STEM classrooms and spaces for design studios and technology and fabrication shops were located within the renovated classroom building.

This article originally appeared in the issue of .

Featured

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

Digital Edition