An Upgrade at Virginia Tech

auditorium McBryde upgradeMcBryde 100 auditorium, a 550-seat raked floor auditorium, is the largest classroom assembly space on the main campus of Virginia Polytechnic and State University (Virginia Tech) in Blacksburg. Heavily used by multiple departments for large format “101” classes, the instruction space, like many similar auditoriums built in the 1970s, was in need of updates and improvements. Designed and executed by the Washington, DC, studio of Westlake Reed Leskosky, the interior renovation addressed accessibility compliance, life safety issues, aging infrastructure, aging technology and worn interior finishes and furnishings.

With one strategic sectional change, Westlake Reed Leskosky solved a variety of accessibility compliance issues, accommodates instructor circulation within the room, and provides for future evolutions in teaching pedagogy. The key renovation design concept of a modified floor slab improves accessibility throughout the space and facilitates more integrated teaching methods for instructors and students. Specifically, the strategy involved changing the rake of the floor to 1:12, adding continuous rails at side aisles, introducing an intermediate aisle, and interspersing ADAcompliant seating spaces throughout the room, while sacrificing only a minimal number of seats from the previous condition.

auditorium McBryde upgradeModern teaching systems via the podium, AV systems projecting on a fixed surface, new seating systems, interior finishes, lighting and acoustical treatments make the auditorium one of the most elegant large-scale teaching environments on campus. The interiors feature new maple wall and ceiling paneling, highly sustainable fabric-wrapped panels, and other finishes inspired by the existing Hokie Stone walls that are prominent throughout campus.

This article originally appeared in the issue of .

Featured

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • Indiana Wesleyan University Schedules Grand Opening for New Welcome Center

    Indiana Wesleyan University recently announced that it will soon open a new Welcome Center on its campus in Marion, Ind., according to a news release. The facility will serve as the home base for prospective students and their families to learn more about the university and student life there. A ribbon-cutting ceremony is scheduled for February 19.