Entrance Flooring Systems

Flooring is usually the first thing that is regularly compromised, especially at high-traffic entrances. Your entrance is where the first line of defense should start for trapping dirt and water.

The flooring product industry has changed significantly and will never stop changing, but the one thing that will be consistent is the significant role entrance flooring systems play to ensure the entrance is kept clean and safe for building users and maintenance staff.

Entrance flooring systems play an integral part by helping to keep the entrance safe from slips, trips and falls while providing exceptional defense for managing dirt and water entering your building. The purpose of all entrance flooring systems is to allow dirt and water to fall through the system, trapping debris underneath the system while keeping the top surface clean. These systems partner well with many types of conditions, depths and flooring products. Employing an entrance flooring system in a recessed pit allows for a smooth transition from one top surface to another. These systems are also available for surface-mounted applications using specific ADA-compliant frame options.

Entrance flooring systems combine design and functionality with an array of insert and logo options, including the ability to work with other types of surrounding flooring materials to optimize a positive first impression.

Now is the time to integrate an entrance flooring system in your new or existing building and win the war on dirt.

This article originally appeared in the issue of .

About the Author

Renee Hite is the assistant Business Development manager for interior wall protection at Construction Specialties. To learn more visit www.c-sgroup.com, call 800/233-8493 or email Renee at [email protected].

Featured

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.