Ceiling Provides Aesthetics and Acoustics

Ceiling Provides Aesthetics and Acoustics

Aesthetics and acoustics were critical elements in the design of the new 16-story multi-use residence hall at the Berklee College of Music. Armstrong Ceilings was able to provide both.

As part of its new 16-story, multi-use residence hall in the heart of Boston, the Berklee College of Music desired a space that would serve as a dining area during the day and a performance venue at night. Because of this dual function, both aesthetics and acoustics were key considerations in its design.

To meet the challenge, the design team at William Rawn Associates created the “Caf,” a two-story, 400-seat space featuring a 32-foothigh ceiling, a gracefully curved second floor balcony, and a floor-to-ceiling glass wall overlooking busy Massachusetts Avenue.

To complement the urban setting, the design team wanted to impart a dynamic quality to the space. One way it accomplished that was the use of MetalWorks Torsion Spring panels from Armstrong Ceiling Solutions in a custom red color in the ceiling and MetalWorks WH100 panels on the wall. Red was chosen because it is the school color and both eye-catching and highly visible from the street.

The ceiling panels are installed in a series of clouds that mirror the contour of the balcony’s “ribbon wall,” which features sweeping curves in order to redirect sound. All of the panels in the ceiling and wall are perforated and backed with a fiberglass infill for acoustic control.

The wall panels are also custom-sized because of the curvilinear nature of the wall’s design. The panels are all the same height but have different widths depending on the radius and arc length.

“To create the space we desired, we knew we would be heavily reliant on the ceiling and wall surfaces, both in terms of aesthetics and acoustics,” states designer Brian Putnam. “It’s amazing how much of a signature element they have become.”

www.armstrong.com/commceilingsna

This article originally appeared in the issue of .

Featured

  • Construction Begins on 100+ Acre K–12 Campus Designed for Lakota Culture

    The Cheyenne River Sioux Tribe (CRST) and the Cheyenne-Eagle Butte School District in Eagle Butte, S.D., recently broke ground on a new K–12 campus that will cover more than 100 acres and serve students and families across 1,600 square miles, according to a news release.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.