ProTeam Launches GoFit 6 HEPA Backpack Vacuum

Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

Product amenities include HEPA filtration; multiple applications including remediation and lead-safe abatement, as well as use in hospitals, clinics, and patient-care settings; alignment with the EPA’s definition of a HEPA vacuum according to the Lead Safety Renovation, Repair, and Painting Rule; and a unique method of suction that avoids agitating dust, the news release reports.

“The new GoFit 6 HEPA is an evolution from our LineVacer,” said ProTeam Vice President and General Manager Matt Reimers. “Launching this unit is the latest in expanding our GoFit product lineup which features corded and cordless models. All these vacuums, including the new HEPA unit, are designed to make efficient use of our customers time while feeling comfortable to wear.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UT System Board of Regents Approves $108M Housing Complex

    The University of Texas System Board of Regents recently announced the approval of a new, $108-million housing complex at the University of Texas at El Paso (UTEP), according to a news release. The facility will stand four stories and have a total of 456 new beds for freshmen students.

  • Geometric abstract school illustration

    How Design Shapes Learning and Success

    Can the color of a wall, the curve of a chair, or the hum of fluorescent lights really affect how a student learns? More schools are beginning to think so.

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

Digital Edition