McREL Study Finds Link Between School Climate and Literacy Achievement

A study taking a closer look at the relationship between staff survey results and student performance at elementary schools across the state of Victoria, Australia, found a statistically significant link between school climate and achievement in literacy at the 5th grade level.

The predictive validity study, conducted by McREL researcher Tedra Clark and Roger Goddard of Ohio State University, focused on the effects on student achievement of five vital areas of school functioning: school climate; school leadership; professional learning; staff safety and well-being; and teaching and learning.

Teachers at 82 elementary and secondary schools across Victoria were asked about these five areas on a school staff opinion survey that McREL developed for the state’s Department of Education and Training. Further investigation showed that, though all five areas were highly interrelated and positively connected to student outcomes in literacy and numeracy, the most significant finding was that staff perceptions of school climate were predictive of 5th grade literacy achievement.

Using various statistical models, the researchers were able to “unpack” this relationship and found that the link occurs on a mediated path: Strong leadership at the school level led to better teacher collaboration and academic optimism, which led to literacy achievement. In other words, school leadership predicts student literacy scores through greater teacher collaboration and academic optimism.

This connection explained over 75 percent of the school-to-school variance in literacy achievement, said Clark. “This model is not only statistically strong,” she said, “but also holds up in different contexts and with different student populations.”

According to McREL Chief Program Officer Robin Jarvis, these findings also support the value of using multiple measures, such as climate surveys, not only to understand the factors affecting student achievement but also “to measure changes in those leading achievement indicators in order to intervene, when necessary, to ultimately improve student achievement.”

For more information on the school climate survey and results analysis, please visit www.mcrel.org/success-stories.

Featured

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • iPark 87

    Building a Future-Focused Career and Technical Education Center

    A district superintendent shares his team's journey to aligning student passions with workforce demands, and why their new CTE center could be a model for districts nationwide.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • Rhode Island Boarding School Completes Student Dorm Renovations

    St. George’s School in Middletown, R.I., recently announced the completion of a $26-million renovation project on Arden-Diman-Eccles Dormitory, according to a news release. The school partnered with Voith & Mactavish Architects (VMA) on the new space, which places a new focus on collaborative community spaces open to both boarding students and day students.

Digital Edition