What costs should be considered for flooring?

A floor covering, especially for today’s active learning environments, must be durable, maintain its appearance and support the desired instructional-intended design of that space. When considering these factors — and knowing a flooring surface is typically the largest of any surface in a space — specifying the right flooring product is important to get the most for long-term use.

When budgets are tight, it can be tempting to select low-cost or inexpensive flooring. This approach might save money upfront for material and installation cost, but it can have consequences on the back end. Lower-cost flooring may require more maintenance over time, or it might need replacing sooner than expected, costing more money in the long run.

When selecting flooring for an educational environment, facility experts should consider not only the upfront costs, but also the expected total “lifecycle cost of ownership” for that product.

Calculating this cost does not need to be time-consuming. Some industry associations and manufacturers offer tools to help facility executives with this important task, including online calculators that enable users to compare lifecycle costs across various flooring types, including hard surfaces, soft surfaces and textile composite floorings. This allows facility professionals to make informed decisions about product choices and associated costs. Going through the process can ensure that facility professionals maximize the dollars spent on their purchase.

When it comes to flooring, it’s important to know the costs beyond the initial material and installation — including maintenance time, tools and replacement considerations.

This article originally appeared in the issue of .

About the Author

Bob Bethel is the director of Business Development, Education, for J+J Flooring Group. J+J offers an online calculator, floorlifecost.com. Bob can be reached at [email protected] or 800/241-4586.

Featured

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Armstrong World Industries Acquires Parallel Architectural Products

    Armstrong World Industries, provider of interior and exterior architectural applications, recently announced that it has acquired the Colorado-based Parallel Architectural Products, according to a news release.

  • University of Illinois Moves Forward with College Sports’ Largest Digital Scoreboard

    The University of Illinois in Champaign, Ill., recently announced a series of upgrades to Gies Memorial Stadium that will include the largest scoreboard in college sports, according to a news release.

Digital Edition