What Is the Difference Between Emergency Response and Pre-Incident Plan?

Emergency situations come in many forms. While some are predictable (such as hurricanes and severe winter storms), others (such as tornadoes, active shooters, biohazard incidents) happen with little or no warning. In any of those cases, excellent emergency response is critical to saving lives and property.

We are often asked, or find ourselves needing to clarify, the difference between an emergency response plan and a pre-incident plan. An emergency response plan defines the roles, responsibilities and procedures that need to go into effect during an emergency. It should include evacuation and lock-down procedures, as well as focus on communications processes both internally and with external parties. Regularly scheduled drills also are essential for optimum preparation.

The pre-incident plan (or pre-plan) is a tool that centralizes all critical building and property information required by first responders so they can act with knowledge. This should include site plans, floor plans, hazardous material details, locations of utility shut-offs and fire hydrants, geographical maps and other critical building and infrastructure details. Hosted either by property management or a municipal fire department, an up-to-date plan is essential to reduce the risk to occupants, responders and the property.

A digital pre-plan makes the information highly shareable between property management, first responders and mutual aid stations. This is critical if there are occupants with special needs, such students with cognitive or developmental disabilities. Your pre-plan should supplement and complement any emergency response plan.

This article originally appeared in the issue of .

About the Author

Len Karson is an account executive at RealView, LLC, developers of digital preincident plan technology. He can be reached at [email protected].

Featured

  • California High School Starts Construction on STEAM, Music Buildings

    Tamalpais High School, part of the Tamalpais Union High School District, recently broke ground on two new major facilities for its campus in Mill Valley, Calif., according to a news release. The district is partnering with Quattrocchi Kwok Architects (QKA) and Lathrop Construction Associates for the Science Technology, Engineering, Arts, and Mathematics (STEAM) and Music Buildings, both replacing their outdated counterparts.

  • How One School Reimagined Learning Spaces—and What Others Can Learn

    When Collegedale Academy, a PreK–8 school outside Chattanooga, Tenn., needed a new elementary building, we faced the choice that many school leaders eventually confront: repair an aging facility or reimagine what learning spaces could be. Our historic elementary school held decades of memories for families, including some who had once walked its halls as children themselves. But years of wear and the need for costly repairs made it clear that investing in the old building would only patch the problems rather than solve them.

  • Extron, CENTEGIX Partner for Comprehensive School Security Solution

    Professional audiovisual solutions provider Extron recently announced a partnership with CENTEGIX, which provides rapid incident response technology, to integrate two of their top products in the name of school safety.

  • Missouri State University Debuts Construction Education Center

    Missouri State University in Springfield, Mo., recently opened a new 10,000-square-foot addition and renovation to support the School of Construction, Design, and Project Management, according to university news. The Construction Education Success Center, built onto the existing Kemper Hall, provides academic space for the school’s construction managers and cost $9.6 million.

Digital Edition