Arlington Independent School District's Eddy + Debbie Peach Elementary School Completed

A Collaborative Environment Fostering Imagination Through Playful + Creative Design.

Debbie Peach Elementary School The new Eddy & Debbie Peach Elementary School for Arlington ISD is located on a 9.7-acre site north of Interstate-30. The educational program of the new school includes core classrooms, grade level collaboration spaces and shared academic spaces including science, music, and art. The facility also incorporates a state of the art Media Center, Cafetorium and a multi-purpose Gymnasium along with a joint use space with the Boys & Girls Club, providing after school activities for all school ages.

The project features an engaging site design that flows from the front of the site, through the building, and to the exterior public spaces near the back of the site. The circular and playful motifs create multiple unique experiences as a student moves through this central core of the building. Some of the key areas highlighted along this core are an outdoor art and science learning lab on the school’s second level, a double volume media center, and an outdoor learning environment that serves as an extension of the media center, as well as outdoor break out spaces for core classrooms. All of these spaces allow for an inspiring and stimulating educational environment for students and teachers. Along this central core on the south side of the school is a two-level classroom bar with break out collaboration spaces, all with natural daylight and views to the landscape. The public spaces are located on the north side of the central core and are situated to allow for easy pick up and drop off and can be secured from the academic portions of the building for evening activities. The architecture and interior design for the project was completed by Perkins+Will.

For more information, visit Eddy & Peach Elementary.

Featured

  • North Dakota State University Completes Music School Renovation

    North Dakota State University in Fargo, N.D., recently announced that construction on the Challey School of Music has finished, according to a news release. The university partnered with Foss Architecture & Interiors for design and Kraus-Anderson for construction services, and construction began in July 2024.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

Digital Edition