Massachusetts Institute of Technology: W97

Massachusetts Institute of Technology

PHOTOS © JON SACHS, MIT SHASS COMMUNICATIONS

The Massachusetts Institute of Technology (MIT) has opened its first dedicated performing arts facility on its Cambridge, MA, campus. The completion of W97, a newly designed building for MIT’s vibrant Theater Arts program, signals a strong commitment to this central component of the Institute’s arts curriculum that has outgrown its current dispersed facilities. Enrollment in theater arts classes has more than doubled at MIT since 2012.

The Theater Arts program, which had previously been spread among five small shared campus facilities, will now be consolidated within a major dedicated 25,000-square-foot building — designed by designLAB Architects of Boston — which has taken shape within the walls of a former warehouse that had been slated for demolition.

MIT students and faculty now have a two-story flexible black box theater with 150-180 seats, state-of-the-art rehearsal spaces and design studios, offices and dressing rooms. The building was designed with production in mind and to maximize the possibilities for experimentation with new theater technologies. Other studios in the building provide space for smaller performances, faculty and student workshops, rehearsals and classes in theatrical practice, design and technical arts.

The new facility will allow for continued development of a theater research program focused on experimental works and performance, and potentially a small, focused graduate program. Moreover, the MIT Theater Arts program will now be on par with comparable programs at peer institutions.

Sustainability was also a project priority, with the goal of achieving LEED Gold certification. Sustainable elements include new windows and roofing, a solar-ready building, LED lighting with occupancy sensors and upgraded HVAC systems.

MIT President L. Rafael Reif will dedicate the building on November 16, 2017, in a celebration that will highlight the range of both the building and the programs in Music and Theater Arts.

This article originally appeared in the issue of .

Featured

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • FAU Starts Construction on Holocaust and Jewish Studies Building

    Florida Atlantic University recently began construction on a new academic building for its campus in Boca Raton, Fla., according to university news. The Kurt and Marilyn Wallach Holocaust and Jewish Studies Building will stand two stories, measure in at 22,000 square feet, and play home to the university’s Holocaust education and Jewish studies programs.

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

Digital Edition