Walls Stand Up to Demands of Nursing Education

Acrovyn

Acrovyn by Design partition walls stood up to the rigorous demands of a nursing lab environment, while also fitting in well with the lab’s “healthcare aesthetic.”

A reflection of the growing healthcare occupational trend is apparent in Pellissippi State Community College’s Nursing Program, where enrollment at the Knoxville, TN, campus continues to increase. The college’s administrators wanted to transform a single, open lab space and a classroom into three protected, unique spaces. The solution included Acrovyn by Design on partition walls to artfully designate separate areas.

The learning environment in the Jenny & Randy Boyd Building at the Strawberry Plains campus required renovations of the 24,250 available-square-feet to meet the needs of both students and faculty.

The addition of an operable wall was necessary to better accommodate multiple teaching scenarios, such as learning how to perform and master skills prior to entering the obstetric and pediatric clinical sites.

It was essential that the walls in the nursing skills lab could contend with a busy, educational atmosphere. This required the walls to be durable and easy to clean. The design team focused on delivering a look that exceeded all the project’s requirements for durability, professionalism and cleanliness.

“Our solution to put Acrovyn by Design on the partition walls makes them as beautiful as they are easy to clean. We are also pleased with the durability Acrovyn by Design brings to Pellissippi’s nursing skills lab. In a dynamic learning space with moving nursing beds and carts, protection for the operable walls was imperative,” says Bill Vinson of Community Tectonics Architects. “Acrovyn by Design’s Organic Collection fit beautifully into the lab’s healthcare aesthetic.”

Pleased with the beautiful modification of its nursing skills lab, Pellissippi administrators requested that Acrovyn by Design be placed on additional partition walls in the pediatric skills lab, the obstetrics lab and another classroom at the Strawberry Plains campus as well.

www.acrovynbydesign.com

This article originally appeared in the issue of .

Featured

  • GeoCam and UCLA: Modernizing Campus Accessibility Mapping

    In early 2025, UCLA partnered with GeoCam to capture and modernize its pedestrian infrastructure data. The goal was ambitious but clear: to produce a high-accuracy, imagery-backed digital map of every sidewalk, pathway, ramp, and ADA-related feature on UCLA’s 419-acre campus.

  • Classical building columns display digital data streams

    The Campus Nervous System: Why Facilities Risk Is Now a Leadership Issue in Higher Education

    Facility performance now intersects with safety, compliance, on-campus experience, institutional reputation, and financial resilience. That places it firmly on the leadership agenda.

  • Washington State District Breaks Ground on New Elementary School

    Cheney School District No. 360 in Spokane County, Wash., recently announced that construction has begun on a new elementary school, according to local news. The district held a groundbreaking ceremony on May 18 in Airway Heights for the yet-to-be-named school, which is scheduled to open in fall 2027.

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.