Lee College hosts Ribbon Cutting for Expanded Nursing Complex

Lee CollegeLee College in Baytown, TX, is preparing to cut the ribbon and open the doors to the newly expanded McNulty-Haddick Nursing Complex, where students train for careers as competent and compassionate nurses ready to provide patient-centered care and be part of an interdisciplinary healthcare team.

The Complex contains a new lecture hall that seats 105 students; additional classrooms that can also be used for lab spaces and give faculty and students a variety of ways to interact and enhance instruction; and a new lounge, computer area and outside patio for students to connect with each other and review coursework in close proximity to their classrooms and labs.

The Clinical Lab and Simulation Center inside the complex—a replicated hospital setting where students practice their professional skills with high-fidelity mannequins that sweat, bleed and even give birth—has been expanded to add an area dedicated specifically to pediatric care. Through a donation to the Lee College Foundation and grant funding from the state’s Nursing Innovation Grant Program, the Clinical Lab and Simulation Center have also received new mannequins, supplies and equipment that will allow faculty to teach clinical application in each nursing course throughout the program curriculum.

“We are able to simulate any patient scenario in a safe practice environment,” says Dr. Tracy Allen, director of the nursing program and a Lee College alumna. “The students are able to gain the nursing knowledge and skills regarding patient care necessary to function as a nurse in today’s professional workforce.”

Featured

  • Q&A: How to Prevent Kitchen Grease Fires in Commercial Kitchens

    School cafeterias and university dining halls serve thousands of meals daily, relying on high-heat equipment like fryers, grills, and ovens. While these operations keep students fed, they also generate significant grease-laden vapors. Without proper controls, this grease becomes a silent fire threat. As a certified exhaust cleaning specialist and business coach who has helped hundreds of institutional facilities achieve NFPA 96 compliance, I emphasize that proactive grease management isn’t optional; it’s a core fire/life safety practice.

  • Myrtle Grove Elementary

    Phased Construction Keeps Students on Campus During Rebuild

    When Escambia County School District needed to replace most of Myrtle Grove Elementary School in Pensacola, Fla., it had three distinct challenges: honor the school's legacy in the community, bring state-of-the-art learning environments to the county, and be seamlessly built on the same site as the active school campus.

  • GeoCam and UCLA: Modernizing Campus Accessibility Mapping

    In early 2025, UCLA partnered with GeoCam to capture and modernize its pedestrian infrastructure data. The goal was ambitious but clear: to produce a high-accuracy, imagery-backed digital map of every sidewalk, pathway, ramp, and ADA-related feature on UCLA’s 419-acre campus.

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.