University of Florida: Newell Hall Renovation

University of Florida

PHOTOS © THE UNIVERSITY OF FLORIDA

Originally designed in 1910, Newell Hall is the third oldest building on the University of Florida’s Gainesville campus. The building, vacant since 2012, needed new life. After some time, the university recognized a need for an informal study space that responded to the way that 21st-century students learn, and embarked on an ambitious project to substantially renovate the aged facility into an active learning commons. The student government strongly supported the need for this type of space and helped turn the project into a reality by lobbying for funds from the Florida Legislature. Completed in April 2017, Newell Hall is now a flexible, technology-rich, innovative learning environment for students to collaborate, study and share ideas 24/7.

Listed on the National Register of Historic Places since 1979, the Newell Hall Renovation required adherence to strict standards for preserving the historic structure. SchenkelShultz Architecture (Architect of Record) and Robert A.M. Stern Architects (Design Architect) were tasked with restoring some of the building’s original components. The effort included restoring the north entry doors that were bricked over in the 1940s, adding new energy-efficient windows with historic profiles to match the original design, and restoring brick and terra cotta accent elements. The exterior maintains the original character of the historic design and seamlessly blends with the other buildings in the campus’ historic district.

The interior of the building is a vast departure from the traditional exterior. An open floor plan gives students a variety of spaces for focus, collaboration, and interaction. Each floor of the four-story building includes a diversity of zones with flexible furniture systems and configurations allowing students to easily adapt spaces to fit their needs whether they are working in groups, one-on-one or independently. Additionally, the first floor includes a café that opens to a landscaped outdoor patio that provides opportunities for rejuvenation.

Newell Hall has successfully filled a void on campus giving students a unique, active studying environment.

This article originally appeared in the College Planning & Management February 2018 issue of Spaces4Learning.

Featured

  • Houston K–12 District Opens New Elementary School

    The Lamar Consolidated Independent School District (Lamar CISD) recently announced the completion of a new elementary school in a western suburb of Houston, Texas, according to a news release. Haygood Elementary School measures in at 110,000 square feet, has the capacity for 854 students, and is the first of three new schools scheduled to be built in the Cross Creek West community.

  • Countway Library at Harvard Medical School

    From Shadows to Sanctuary: The Transformation of Light at Countway Library

    The renovation of Countway Library at Harvard Medical School demonstrates how biophilic design and advanced lighting strategies transformed a formerly dark, insular space into a vibrant, welcoming hub that supports wellness, learning, and community engagement.

  • Illinois State University Breaks Ground on College of Fine Arts Transformation

    Illinois State University in Normal, Ill., recently held a groundbreaking ceremony for the Wonsook Kim College of Fine Arts transformation project, according to university news. The series of new constructions and renovations will upgrade spaces in Centennial East, the Center for the Visual Arts, and the Center for the Performing Arts, as well as replace the existing Centennial West facility with a new Commons Building.

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

Digital Edition