CSU, Chico to Break Ground on New Physical Science Building

This week saw the unveiling of the first images of the new Physical Sciences Building at California State University, Chico (CSU, Chico), in Chico CA. The groundbreaking for the new facility, which will include new teaching facilities and equipment, will take place in the fall of 2018. The new building will help emphasize STEM disciplines, and also encourage collaboration between science and engineering students, and the campus community.

CSU Chico

Designed by San Francisco firm SmithGroupJJR and slated to open in Fall 2020, the building will house classrooms and labs for a host of science disciplines including chemistry, physics, and geology. The building also emphasizes spaces for students to come together in indoor and outdoor settings, and use the natural environment campus as a tool to enhance classroom and in-the-field science education. There will also be a hands-on lab space for K-12 students to come learn and work with CSU, Chico Students across a range of science disciplines. 

The new building is being envisioned with sustainability as a key component, with the design team being mindful of energy and water use required by science laboratories, and designing the facility in a way that will maximize overall energy savings. The building is being funded by system-wide Revenue Bond Program along with campus designated reserves.

Featured

  • St. Lucie County, Fla., Breaks Ground on New K–8 School

    St. Lucie Public Schools in St. Lucie County, Fla., recently held a groundbreaking ceremony for a new K–8 school, according to a news release. The district partnered with Spiezle Architectural Group, Inc., for the design of the upcoming Ft. Pierce K–8 School, which comprises six buildings covering 215,000 square feet.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • Designing the Bridge Between Inclusivity and Independence in K–12 Schools

    Fostering independence is fundamental to learning and development for K–12 students. It offers many proven benefits, such as enhanced confidence, problem-solving, decision-making, and social skills. However, this foundational objective loses its impact if it’s not accessible and adaptable to all students. Inclusivity plays a critical role in cultivating independence and healthy autonomy for students, fostering positive student learning outcomes by uniting pedagogy with the physical learning environment.

  • Spaces4Learning Launches 2026 Facilities and Construction Brief Survey

    Spaces4Learning recently launched the 2026 Facilities and Construction Brief Survey, which collects data on the previous year’s K–12 and higher education construction projects nationwide.