How Rubber Flooring Impacts Life-Cycle Costs

The demands placed on flooring in educational facilities are significant. Steady foot traffic and heavy rolling loads can quickly compromise a floor’s original beauty and integrity. With increasing pressure to lower operational expenses, many learning institutions are turning to Life-Cycle Cost Analysis (LCCA) to determine which flooring material offers the greatest durability and resilience, and how that directly translates to value and cost savings. Rubber flooring has proven to be a leader in this category. Here’s why:

  • Installation
    Rubber flooring with a self-adhesive backing can be installed directly over an existing floor. It has fewer seams with less cutting and joint sealing, resulting in faster turn-times reducing your timeline by up to half.
  • Durability
    The extremely dense surface of rubber flooring can withstand the pressure of heavy loads and is highly resistant to liquid spills and harsh chemicals.
  • Maintenance
    Flooring maintenance can account for 75 to 90 percent of total cost over the product’s projected lifespan. Premium rubber flooring has a nonporous surface that inherently repels stains and can be cleaned with little more than water. Unlike other resilient flooring, rubber’s uncoated surface means the floor never needs to be stripped and resealed.
  • Sustainability
    Rubber flooring is naturally sourced and has a low-VOC rating, contributing to a healthier environment and improved indoor air quality (IAQ) for students and staff alike.

Premium rubber flooring has significant impact on total cost of ownership. Using LCCA during flooring specification helps schools lower expenses long-term while increasing the health and safety of students, faculty, and staff.

This article originally appeared in the School Planning & Management June 2018 issue of Spaces4Learning.

About the Author

Tasha Hughes is a marketing specialist, PR, for nora systems, Inc. (www.nora.com/us). She can be reached at [email protected] or 800-332/NORA.

Featured

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • University of Tennessee at Chattanooga Launches New Emergency Communications System

    The University of Tennessee at Chattanooga (UTC) recently deployed a new emergency notification and incident management system for its campus, according to a news release. The university partnered with 911Cellular to launch Safe@UTC, a smartphone app allowing university officials to communicate and respond during emergency situations.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • University of Arizona Approves New Residence Hall

    The Arizona Board of Regents recently approved plans for a new residence hall at the University of Arizona in Tucson, Ariz., according to a news release. The new facility is scheduled to open in fall 2028 and have the capacity for more than 1,200 students, enforcing a new university expectation that all first-year students live on campus.